X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384030506C00

Well Details

Well ID: 0384030506C00
Loading map...
Location: C0/06-05-038-03W4/0
Location Alias: C0/06-05-38-03 W4M
Location Alias 2: C0/06-05-038-03 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1C0 PROVOST 6-5-38-3
Operator Name: West Lake Energy Corp.
License Number: 0158490
License Date: 1993-05-21
License Status: Suspension
Spud Date: 1993-06-15
Final Drill Date: 1993-06-18
Well Total Depth: 876.00 m
Surface Hole Latitude: 52.237320
Surface Hole Longitude: -110.404321

For data sources see[1][2]

Well History

Date Event
1993-05-21 Obtained License
1993-06-16 Surface Casing Operation Performed
1993-06-17 Direction Drilling Operation Performed - Deviate
1993-06-18 Finished Drilling
1993-06-18 Well Log Performed
1993-06-18 Well Mode changed to Drilled and Cased
1993-06-19 Production Casing Operation Performed
1993-06-19 Rig Released
1993-06-22 Well Log Performed
1993-06-26 Perforation Treatment Performed - Jet Perforation
1993-06-26 Well Log Performed
1993-07-08 Well Began Production
1993-07-08 Well Fluid changed to Crude Oil
1993-07-08 Well Mode changed to Pumping
1999-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-04-27 Perforation Treatment Performed - Jet Perforation
1999-04-27 Plug Back Performed
1999-04-27 Well Fluid changed to Crude Oil
1999-04-27 Well Log Performed
1999-04-27 Well Mode changed to Abandoned Zone
1999-05-05 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-06-17 301.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-26 Perforation 845.50 848.00 17
1999-04-27 Packing Device Capped w/Cement 834.00 842.00 0
1999-04-27 Perforation 813.00 817.00 18
1999-05-05 Fracture 813.00 817.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 4219 0.0 0.0 0.0
1994 8570 0.0 0.0 0.0
1995 8652 0.0 0.0 0.0
1996 8543 0.0 0.0 0.0
1997 8584 0.0 0.0 0.0
1998 7597 0.0 0.0 0.0
1999 2340 0.0 0.0 0.0

For data sources see[6]

References