X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384030506B42

Well Details

Well ID: 0384030506B42
Loading map...
Location: B4/06-05-038-03W4/2
Location Alias: B4/06-05-38-03 W4M
Location Alias 2: B4/06-05-038-03 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1B4 PROVOST 6-5-38-3
Operator Name: West Lake Energy Corp.
License Number: 0189912
License Date: 1996-07-25
License Status: Suspension
Spud Date: 1996-09-04
Final Drill Date: 1996-09-08
Well Total Depth: 868.00 m
Surface Hole Latitude: 52.234326
Surface Hole Longitude: -110.403787

For data sources see[1][2]

Well History

Date Event
1996-07-25 Obtained License
1996-09-05 Surface Casing Operation Performed
1996-09-06 Direction Drilling Operation Performed - Deviate
1996-09-08 Finished Drilling
1996-09-08 Well Log Performed
1996-09-08 Well Mode changed to Drilled and Cased
1996-09-09 Production Casing Operation Performed
1996-09-09 Rig Released
1996-09-13 Perforation Treatment Performed - Jet Perforation
1996-09-13 Well Log Performed
1996-10-22 Well Log Performed
1999-04-23 Well Log Performed
1999-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-04-24 Perforation Treatment Performed - Fractured
1999-04-24 Perforation Treatment Performed - Jet Perforation
1999-04-24 Plug Back Performed
1999-05-04 Well Began Production
1999-05-04 Well Fluid changed to Crude Oil
1999-05-04 Well Mode changed to Pumping
1999-05-05 Well Fluid changed to Crude Oil
1999-05-05 Well Mode changed to Pumping
2011-01-12 Well Fluid changed to Crude Oil
2011-01-12 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-09-06 521.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-13 Perforation 840.50 843.00 17
1999-04-24 Packing Device Capped w/Cement 829.00 837.00 0
1999-04-24 Perforation 803.00 807.00 18
1999-04-24 Fracture 803.00 807.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5149 0.0 0.0 0.0
2000 6893 0.0 0.0 0.0
2001 8666 0.0 0.0 0.0
2002 8436 0.0 0.0 0.0
2003 7595 0.0 0.0 0.0
2004 7776 0.0 0.0 0.0
2005 8026 0.0 0.0 0.0
2006 8573 0.0 0.0 0.0
2007 8581 0.0 0.0 0.0
2008 1343 0.0 0.0 0.0
2009 5366 0.0 0.0 0.0
2010 2096 0.0 0.0 0.0

For data sources see[6]

References