X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384030504A70

Well Details

Well ID: 0384030504A70
Loading map...
Location: A7/04-05-038-03W4/0
Location Alias: A7/04-05-38-03 W4M
Location Alias 2: A7/04-05-038-03 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1A7 PROVOST 4-5-38-3
Operator Name: West Lake Energy Corp.
License Number: 0217887
License Date: 1998-10-02
License Status: Abandoned
Spud Date: 1998-10-14
Final Drill Date: 1998-10-16
Well Total Depth: 877.00 m
Surface Hole Latitude: 52.231028
Surface Hole Longitude: -110.403747

For data sources see[1][2]

Well History

Date Event
1998-10-02 Obtained License
1998-10-14 Surface Casing Operation Performed
1998-10-15 Direction Drilling Operation Performed - Deviate
1998-10-16 Finished Drilling
1998-10-16 Well Log Performed
1998-10-16 Well Mode changed to Drilled and Cased
1998-10-17 Production Casing Operation Performed
1998-10-17 Rig Released
1998-10-19 Well Log Performed
1998-10-21 Perforation Treatment Performed - Jet Perforation
1998-10-21 Well Log Performed
1998-10-23 Perforation Treatment Performed - Chemical Squeeze
1998-10-26 Well Log Performed
1998-10-27 Well Began Production
1998-10-27 Well Fluid changed to Crude Oil
1998-10-27 Well Mode changed to Pumping
2010-11-17 Well Fluid changed to Crude Oil
2010-11-17 Well Mode changed to Suspended
2018-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-28 Plug Back Performed
2018-06-28 Well Fluid changed to Crude Oil
2018-06-28 Well Log Performed
2018-06-28 Well Mode changed to Abandoned Zone
2018-08-17 Well Abandoned
2018-08-17 Well Fluid changed to Crude Oil
2018-08-17 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-10-15 160.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-10-21 Perforation 809.00 812.00 17
1998-10-23 Chemical Squeeze 809.00 812.00 0
2018-06-28 Packing Device Capped w/Cement 795.00 803.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1507 0.0 0.0 0.0
1999 8547 0.0 0.0 0.0
2000 8689 0.0 0.0 0.0
2001 8725 0.0 0.0 0.0
2002 8687 0.0 0.0 0.0
2003 5425 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-06-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References