X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384030504A52

Well Details

Well ID: 0384030504A52
Loading map...
Location: A5/04-05-038-03W4/2
Location Alias: A5/04-05-38-03 W4M
Location Alias 2: A5/04-05-038-03 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1A5 PROVOST 4-5-38-3
Operator Name: West Lake Energy Corp.
License Number: 0200929
License Date: 1997-05-05
License Status: Suspension
Spud Date: 1997-05-13
Final Drill Date: 1997-05-16
Well Total Depth: 873.00 m
Surface Hole Latitude: 52.232462
Surface Hole Longitude: -110.404944

For data sources see[1][2]

Well History

Date Event
1997-05-05 Obtained License
1997-05-14 Surface Casing Operation Performed
1997-05-15 Direction Drilling Operation Performed - Deviate
1997-05-16 Finished Drilling
1997-05-16 Well Log Performed
1997-05-16 Well Mode changed to Drilled and Cased
1997-05-17 Production Casing Operation Performed
1997-05-17 Rig Released
1997-05-22 Well Log Performed
1997-05-27 Perforation Treatment Performed - Jet Perforation
1997-05-27 Well Log Performed
1997-05-28 Well Log Performed
1998-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-28 Perforation Treatment Performed - Cement Squeeze
1998-09-28 Plug Back Performed
1998-09-29 Perforation Treatment Performed - Jet Perforation
1998-09-29 Well Log Performed
1998-09-30 Perforation Treatment Performed - Fractured
1998-10-04 Well Began Production
1998-10-04 Well Fluid changed to Crude Oil
1998-10-04 Well Mode changed to Pumping
1999-09-22 Well Log Performed
1999-12-01 Well Began Injection
1999-12-01 Well Fluid changed to Water
1999-12-01 Well Type changed to Injection
2004-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-05-01 Well Fluid changed to Water
2016-05-01 Well Mode changed to Suspended
2016-05-01 Well Type changed to Injection
2017-09-01 Well Fluid changed to Water
2017-09-01 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-05-15 496.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-27 Perforation 836.50 839.00 18
1998-09-28 Cement Squeeze 836.50 839.00 0
1998-09-28 Packing Device Capped w/Cement 820.00 830.90 0
1998-09-29 Perforation 803.50 806.00 18
1998-09-30 Fracture 803.50 806.00 0
2004-09-30 Acid Treatment 803.50 806.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1895 0.0 0.0 0.0
1999 2237 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References