X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384030503C02

Well Details

Well ID: 0384030503C02
Loading map...
Location: C0/03-05-038-03W4/2
Location Alias: C0/03-05-38-03 W4M
Location Alias 2: C0/03-05-038-03 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1C0 PROVOST 3-5-38-3
Operator Name: West Lake Energy Corp.
License Number: 0146487
License Date: 1990-11-23
License Status: Suspension
Spud Date: 1990-12-05
Final Drill Date: 1990-12-08
Well Total Depth: 879.00 m
Surface Hole Latitude: 52.234112
Surface Hole Longitude: -110.403790

For data sources see[1][2]

Well History

Date Event
1990-11-23 Obtained License
1990-12-05 Surface Casing Operation Performed
1990-12-07 Direction Drilling Operation Performed - Deviate
1990-12-08 Finished Drilling
1990-12-08 Well Log Performed
1990-12-08 Well Mode changed to Drilled and Cased
1990-12-09 Production Casing Operation Performed
1990-12-09 Rig Released
1990-12-14 Well Log Performed
1991-01-05 Well Log Performed
1991-01-14 Perforation Treatment Performed - Jet Perforation
1991-01-14 Well Log Performed
1997-06-09 Perforation Treatment Performed - Jet Perforation
1997-06-09 Well Log Performed
1997-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-24 Perforation Treatment Performed - Jet Perforation
1997-08-24 Plug Back Performed
1997-08-24 Well Log Performed
1997-08-25 Perforation Treatment Performed - Fractured
1997-08-25 Well Log Performed
1997-08-28 Well Began Production
1997-08-28 Well Fluid changed to Crude Oil
1997-08-28 Well Mode changed to Pumping
1998-03-30 Perforation Treatment Performed - Cement Squeeze
1998-03-30 Perforation Treatment Performed - Jet Perforation
1998-04-01 Perforation Treatment Performed - Chemical Squeeze
1998-04-01 Perforation Treatment Performed - Fractured
2010-11-16 Well Fluid changed to Crude Oil
2010-11-16 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-12-07 393.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-14 Perforation 845.50 847.20 13
1998-04-01 Fracture 800.50 810.00 0
1998-04-01 Chemical Squeeze 800.50 810.00 0
1997-06-09 Perforation 849.00 850.00 18
1997-08-24 Packing Device Capped w/Cement 832.00 840.00 0
1997-08-24 Perforation 800.50 810.00 18
1997-08-25 Fracture 800.50 804.50 0
1997-08-25 Fracture 802.50 806.50 0
1998-03-30 Perforation 845.50 847.20 13
1998-03-30 Perforation 849.00 850.00 18
1998-03-30 Cement Squeeze 845.50 850.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2959 0.0 0.0 0.0
1998 8364 0.0 0.0 0.0
1999 5720 0.0 0.0 0.0
2000 6393 0.0 0.0 0.0
2001 8134 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-05 No Incident Encountered 0.00 0.00
1998-04-07 No Incident Encountered 0.00 0.00
2013-05-01 No Incident Encountered 0.00 0.00
1998-03-30 No Incident Encountered 0.00 0.00
2012-12-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References