If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384020410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.240613,"lon":-110.227403,"icon":""}]} |
Location: 00/10-04-038-02W4/0 | |
Location Alias: 00/10-04-38-02 W4M | |
Location Alias 2: 00/10-04-038-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 02 | |
Section: 04 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: ALTANA PROVOST 10-4-38-2 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0051316 | |
License Date: 1974-09-30 | |
License Status: RecCertified | |
Spud Date: 1974-10-15 | |
Final Drill Date: 1974-10-17 | |
Well Total Depth: 835.20 m | |
Surface Hole Latitude: 52.240613 | |
Surface Hole Longitude: -110.227403 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-09-30 | Obtained License |
1974-10-17 | Finished Drilling |
1974-10-18 | Drill Stem Test Performed |
1974-10-19 | Drill Stem Test Performed |
1974-10-20 | Production Casing Operation Performed |
1974-10-20 | Well Mode changed to Drilled and Cased |
1974-10-24 | Perforation Treatment Performed - Jet Perforation |
1974-10-25 | Perforation Treatment Performed - Cement Squeeze |
1974-10-25 | Perforation Treatment Performed - Jet Perforation |
1974-10-27 | Perforation Treatment Performed - Cement Squeeze |
1974-10-28 | Perforation Treatment Performed - Cement Squeeze |
1974-10-30 | Perforation Treatment Performed - Jet Perforation |
1978-04-01 | Well Began Production |
1978-04-01 | Well Fluid changed to Gas |
1978-04-01 | Well Mode changed to Flowing |
1994-10-17 | Well Log Performed |
1994-10-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-19 | Plug Back Performed |
1994-10-19 | Well Fluid changed to Gas |
1994-10-19 | Well Mode changed to Abandoned |
1995-04-18 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1974-10-24 | Perforation | 576.40 | 576.70 | 16 |
1974-10-25 | Perforation | 662.60 | 662.90 | 16 |
1974-10-25 | Perforation | 640.10 | 640.40 | 16 |
1974-10-25 | Cement Squeeze | 576.40 | 662.90 | 0 |
1974-10-27 | Cement Squeeze | 576.40 | 662.90 | 0 |
1974-10-28 | Cement Squeeze | 576.40 | 662.90 | 0 |
1974-10-30 | Perforation | 654.70 | 655.90 | 13 |
1994-10-19 | Packing Device Capped w/Cement | 641.00 | 649.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 5003 | 0.0 | 0.0 | 0.0 |
1979 | 2651 | 0.0 | 0.0 | 0.0 |
1980 | 3871 | 0.0 | 0.0 | 0.0 |
1981 | 2636 | 0.0 | 0.0 | 0.0 |
1982 | 4521 | 0.0 | 0.0 | 0.0 |
1983 | 1609 | 0.0 | 0.0 | 0.0 |
1984 | 3312 | 0.0 | 0.0 | 0.0 |
1985 | 1071 | 0.0 | 0.0 | 0.0 |
1986 | 2845 | 0.0 | 0.0 | 0.0 |
1987 | 1542 | 0.0 | 0.0 | 0.0 |
1988 | 1508 | 0.0 | 0.0 | 0.0 |
1990 | 1653 | 0.0 | 0.0 | 0.0 |
For data sources see[5]