X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384013406000

Well Details

Well ID: 0384013406000
Loading map...
Location: 00/06-34-038-01W4/0
Location Alias: 00/06-34-38-01 W4M
Location Alias 2: 00/06-34-038-01 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 01
Section: 34
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 6-34-38-1
Operator Name: Bow River Energy Ltd.
License Number: 0159022
License Date: 1993-06-10
License Status: Suspension
Spud Date: 1993-07-04
Final Drill Date: 1993-07-09
Well Total Depth: 884.00 m
Surface Hole Latitude: 52.309726
Surface Hole Longitude: -110.065649

For data sources see[1][2]

Well History

Date Event
1993-06-10 Obtained License
1993-07-04 Surface Casing Operation Performed
1993-07-06 Lost Circulation Occurred
1993-07-06 Well Log Performed
1993-07-07 Lost Circulation Occurred
1993-07-07 Production Casing Operation Performed
1993-07-08 Perforation Treatment Performed - Jet Perforation
1993-07-08 Well Log Performed
1993-07-09 Finished Drilling
1993-07-09 Perforation Treatment Performed - Remedial Casing
1993-07-10 Rig Released
1993-07-10 Well Mode changed to Drilled and Cased
1996-10-04 Perforation Treatment Performed - Jet Perforation
1999-08-20 Well Began Production
1999-08-20 Well Fluid changed to Gas
1999-08-20 Well Mode changed to Flowing
2001-07-01 Well Fluid changed to Gas
2001-07-01 Well Mode changed to Suspended
2001-07-04 Perforation Treatment Performed - Jet Perforation
2001-07-04 Well Log Performed
2001-07-05 Well Log Performed
2001-07-12 Well Log Performed
2001-07-14 Perforation Treatment Performed - Cement Squeeze
2001-07-14 Plug Back Performed
2001-07-14 Well Fluid changed to Gas
2001-07-14 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-08 Perforation 675.00 676.00 14
1993-07-09 Remedial Casing Cementing 675.00 676.00 0
1996-10-04 Perforation 762.50 767.00 17
2001-07-04 Perforation 767.00 772.00 20
2001-07-14 Cement Squeeze 762.50 772.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 3194 0.0 0.0 0.0
2000 4996 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-07-06 Lost Circulation 884.00 884.00
1993-07-07 Lost Circulation 884.00 884.00

For data sources see[6]

References