X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384012115A00

Well Details

Well ID: 0384012115A00
Loading map...
Location: A0/15-21-038-01W4/0
Location Alias: A0/15-21-38-01 W4M
Location Alias 2: A0/15-21-038-01 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 01
Section: 21
County/Municipality: Municipal District of Provost No. 52
Well Name: PCP PROVOST 15A-21-38-1
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0137886
License Date: 1988-12-29
License Status: Abandoned
Spud Date: 1989-02-14
Final Drill Date: 1989-02-16
Well Total Depth: 791.00 m
Surface Hole Latitude: 52.285436
Surface Hole Longitude: -110.084262

For data sources see[1][2]

Well History

Date Event
1988-12-29 Obtained License
1989-02-15 Surface Casing Operation Performed
1989-02-16 Finished Drilling
1989-02-16 Well Mode changed to Drilled and Cased
1989-02-17 Well Log Performed
1989-02-18 Production Casing Operation Performed
1989-02-18 Rig Released
1989-03-17 Perforation Treatment Performed - Jet Perforation
1989-05-26 Well Began Production
1989-05-26 Well Fluid changed to Crude Oil
1989-05-26 Well Mode changed to Pumping
1993-12-15 Well Log Performed
1994-11-25 Well Fluid changed to Crude Oil
1994-11-25 Well Mode changed to Suspended
2001-07-13 Well Fluid changed to Crude Oil
2001-07-13 Well Mode changed to Pumping
2003-10-01 Well Fluid changed to Crude Oil
2003-10-01 Well Mode changed to Suspended
2019-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-06 Perforation Treatment Performed - Cement Squeeze
2019-03-06 Plug Back Performed
2019-03-06 Well Fluid changed to Crude Oil
2019-03-06 Well Mode changed to Abandoned Zone
2019-03-26 Well Abandoned
2019-03-26 Well Fluid changed to Crude Oil
2019-03-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-17 Perforation 740.30 742.30 13
1989-03-17 Perforation 744.00 750.00 13
2019-03-06 Cement Squeeze 740.30 742.30 0
2019-03-06 Cement Squeeze 744.00 750.00 0
2019-03-06 Packing Device Capped w/Cement 270.00 285.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 5116 0.0 0.0 0.0
1990 8039 0.0 0.0 0.0
1991 8297 0.0 0.0 0.0
1992 6790 0.0 0.0 0.0
1993 7534 0.0 0.0 0.0
1994 5298 0.0 0.0 0.0
2001 2771 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References