X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384011711020

Well Details

Well ID: 0384011711020
Loading map...
Location: 02/11-17-038-01W4/0
Location Alias: 02/11-17-38-01 W4M
Location Alias 2: 02/11-17-038-01 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 01
Section: 17
County/Municipality: Municipal District of Provost No. 52
Well Name: PCP 11D PROVOST 11-17-38-1
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0196383
License Date: 1997-01-09
License Status: Abandoned
Spud Date: 1997-01-05
Final Drill Date: 1997-01-08
Well Total Depth: 962.00 m
Surface Hole Latitude: 52.266422
Surface Hole Longitude: -110.107611

For data sources see[1][2]

Well History

Date Event
1997-01-05 Direction Drilling Operation Performed - Deviate
1997-01-06 Surface Casing Operation Performed
1997-01-08 Finished Drilling
1997-01-08 Production Casing Operation Performed
1997-01-08 Rig Released
1997-01-08 Well Log Performed
1997-01-08 Well Mode changed to Drilled and Cased
1997-01-09 Obtained License
1997-02-23 Perforation Treatment Performed - Jet Perforation
1997-02-23 Well Log Performed
1997-04-01 Well Began Production
1997-04-01 Well Fluid changed to Crude Oil
1997-04-01 Well Mode changed to Pumping
1998-03-11 Well Fluid changed to Crude Oil
1998-03-11 Well Mode changed to Suspended
2001-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-30 Plug Back Performed
2001-09-30 Well Fluid changed to Crude Oil
2001-09-30 Well Mode changed to Abandoned Zone
2001-10-02 Well Abandoned
2001-10-02 Well Fluid changed to Crude Oil
2001-10-02 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-01-05 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-23 Perforation 902.50 909.00 30
2001-09-30 Packing Device Capped w/Cement 889.00 898.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 5703 0.0 0.0 0.0
1998 1641 0.0 0.0 0.0

For data sources see[6]

References