X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384011710A00

Well Details

Well ID: 0384011710A00
Loading map...
Location: A0/10-17-038-01W4/0
Location Alias: A0/10-17-38-01 W4M
Location Alias 2: A0/10-17-038-01 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 01
Section: 17
County/Municipality: Municipal District of Provost No. 52
Well Name: PCP 10A PROVOST 10-17-38-1
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0193095
License Date: 1996-11-05
License Status: Suspension
Spud Date: 1996-11-28
Final Drill Date: 1996-12-01
Well Total Depth: 818.00 m
Surface Hole Latitude: 52.266176
Surface Hole Longitude: -110.107690

For data sources see[1][2]

Well History

Date Event
1996-11-05 Obtained License
1996-11-28 Direction Drilling Operation Performed - Deviate
1996-11-28 Surface Casing Operation Performed
1996-12-01 Finished Drilling
1996-12-01 Well Log Performed
1996-12-01 Well Mode changed to Drilled and Cased
1996-12-02 Production Casing Operation Performed
1996-12-02 Rig Released
1996-12-15 Well Log Performed
1997-02-24 Perforation Treatment Performed - Jet Perforation
1997-02-24 Well Log Performed
1997-03-14 Well Began Production
1997-03-14 Well Fluid changed to Crude Oil
1997-03-14 Well Mode changed to Pumping
1998-05-31 Well Fluid changed to Crude Oil
1998-05-31 Well Mode changed to Suspended
2000-07-19 Well Fluid changed to Crude Oil
2000-07-19 Well Mode changed to Pumping
2000-08-14 Well Fluid changed to Crude Oil
2000-08-14 Well Mode changed to Suspended
2001-06-09 Well Fluid changed to Crude Oil
2001-06-09 Well Mode changed to Pumping
2014-01-01 Well Fluid changed to Crude Oil
2014-01-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-11-28 112.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-24 Perforation 764.00 768.00 30

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 5907 0.0 0.0 0.0
1998 3594 0.0 0.0 0.0
2000 813 0.0 0.0 0.0
2001 3299 0.0 0.0 0.0
2002 6650 0.0 0.0 0.0
2003 7961 0.0 0.0 0.0
2004 7641 0.0 0.0 0.0
2005 7968 0.0 0.0 0.0
2006 8365 0.0 0.0 0.0
2007 8724 0.0 0.0 0.0
2008 7725 0.0 0.0 0.0
2009 8491 0.0 0.0 0.0
2010 8532 0.0 0.0 0.0
2011 8567 0.0 0.0 0.0
2012 8145 0.0 0.0 0.0

For data sources see[6]

References