X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375083516000

Well Details

Well ID: 0375083516000
Loading map...
Location: 00/16-35-037-08W5/0
Location Alias: 00/16-35-37-08 W5M
Location Alias 2: 00/16-35-037-08 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 08
Section: 35
County/Municipality: Clearwater County
Well Name: YANGARRA HZ FERRIER 16-35-37-8
Operator Name: Yangarra Resources Corp.
License Number: 0437748
License Date: 2011-10-18
License Status: Amended
Spud Date: 2011-11-18
Final Drill Date: 2011-12-19
Well Total Depth: 3597.00 m
Surface Hole Latitude: 52.218503
Surface Hole Longitude: -115.026484

For data sources see[1][2]

Well History

Date Event
2011-10-18 Obtained License
2011-11-22 Surface Casing Operation Performed
2011-11-27 Direction Drilling Operation Performed - Horizontal
2011-12-09 Intermediate Casing Operation Performed
2011-12-19 Finished Drilling
2011-12-19 Well Mode changed to Drilled and Cased
2011-12-22 Liner Casing Operation Performed
2011-12-23 Rig Released
2012-01-07 Well Log Performed
2012-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-13 Perforation Treatment Performed - Open-Hole Completion
2012-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-18 Well Began Production
2012-01-18 Well Fluid changed to Crude Oil
2012-01-18 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-27 2111.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-13 Open Hole/Barefoot Completion 3587.00 3597.00 0
2012-01-15 Multi-Stage Fracture 2893.50 2894.60 0
2012-01-15 Multi-Stage Fracture 2820.20 2821.30 0
2012-01-15 Multi-Stage Fracture 2746.80 2747.90 0
2012-01-15 Multi-Stage Fracture 2661.30 2662.40 0
2012-01-15 Multi-Stage Fracture 2588.20 2589.30 0
2012-01-15 Multi-Stage Fracture 2514.10 2515.20 0
2012-01-13 Multi-Stage Fracture 3499.20 3500.10 0
2012-01-13 Multi-Stage Fracture 3426.80 3427.90 0
2012-01-13 Multi-Stage Fracture 3354.10 3355.20 0
2012-01-13 Multi-Stage Fracture 3270.80 3271.90 0
2012-01-13 Multi-Stage Fracture 3197.50 3198.60 0
2012-01-14 Multi-Stage Fracture 3123.70 3124.80 0
2012-01-14 Multi-Stage Fracture 3049.90 3051.00 0
2012-01-15 Multi-Stage Fracture 2978.50 2979.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4170 0.0 0.0 0.0
2013 7192 0.0 0.0 0.0
2014 7665 0.0 0.0 0.0
2015 8554 0.0 0.0 0.0
2016 8116 0.0 0.0 0.0
2017 8016 0.0 0.0 0.0
2018 5687 0.0 0.0 0.0
2019 1086 0.0 0.0 0.0

For data sources see[6]

References