X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375082103000

Well Details

Well ID: 0375082103000
Loading map...
Location: 00/03-21-037-08W5/0
Location Alias: 00/03-21-37-08 W5M
Location Alias 2: 00/03-21-037-08 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 08
Section: 21
County/Municipality: Clearwater County
Well Name: YANGARRA HZ FERRIER 3-21-37-8
Operator Name: Yangarra Resources Corp.
License Number: 0486438
License Date: 2017-11-20
License Status: Issued
Spud Date: 2017-11-28
Final Drill Date: 2017-12-12
Well Total Depth: 5014.00 m
Surface Hole Latitude: 52.212896
Surface Hole Longitude: -115.092450

For data sources see[1][2]

Well History

Date Event
2017-11-20 Obtained License
2017-11-30 Surface Casing Operation Performed
2017-12-03 Well Log Performed
2017-12-05 Direction Drilling Operation Performed - Deviate
2017-12-06 Direction Drilling Operation Performed - Horizontal
2017-12-12 Finished Drilling
2017-12-12 Well Log Performed
2017-12-12 Well Mode changed to Drilled and Cased
2017-12-14 Production Casing Operation Performed
2017-12-15 Rig Released
2017-12-16 Well Log Performed
2017-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-23 Well Log Performed
2018-01-20 Well Began Production
2018-01-20 Well Fluid changed to Crude Oil
2018-01-20 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-28 Trinidad Drilling Ltd. 42 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-05 1964.90 Deviate (5 - 79 degrees)
2017-12-06 2711.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-19 Multi-Stage Fracture 4966.90 4967.00 0
2017-12-21 Multi-Stage Fracture 3262.30 3262.40 0
2017-12-22 Multi-Stage Fracture 3239.80 3239.90 0
2017-12-22 Multi-Stage Fracture 3217.20 3217.30 0
2017-12-22 Multi-Stage Fracture 3194.40 3194.50 0
2017-12-22 Multi-Stage Fracture 3171.70 3171.80 0
2017-12-22 Multi-Stage Fracture 3149.00 3149.10 0
2017-12-22 Multi-Stage Fracture 3126.30 3126.40 0
2017-12-22 Multi-Stage Fracture 3103.70 3103.80 0
2017-12-22 Multi-Stage Fracture 3081.10 3081.20 0
2017-12-22 Multi-Stage Fracture 3058.40 3058.50 0
2017-12-20 Multi-Stage Fracture 3443.20 4010.50 0
2017-12-22 Multi-Stage Fracture 3035.80 3035.90 0
2017-12-22 Multi-Stage Fracture 3013.10 3013.20 0
2017-12-22 Multi-Stage Fracture 2990.40 2990.50 0
2017-12-22 Multi-Stage Fracture 2967.70 2967.80 0
2017-12-22 Multi-Stage Fracture 2944.80 2944.90 0
2017-12-22 Multi-Stage Fracture 2922.10 2922.20 0
2017-12-22 Multi-Stage Fracture 2899.40 2899.50 0
2017-12-22 Multi-Stage Fracture 2876.80 2876.90 0
2017-12-22 Multi-Stage Fracture 2854.10 2854.20 0
2017-12-22 Multi-Stage Fracture 2831.50 2831.60 0
2017-12-21 Multi-Stage Fracture 3420.50 3420.60 0
2017-12-22 Multi-Stage Fracture 2808.80 2808.90 0
2017-12-22 Multi-Stage Fracture 2786.10 2786.20 0
2017-12-22 Multi-Stage Fracture 2763.50 2763.60 0
2017-12-21 Multi-Stage Fracture 3398.30 3398.40 0
2017-12-21 Multi-Stage Fracture 3375.60 3375.70 0
2017-12-21 Multi-Stage Fracture 3352.90 3353.00 0
2017-12-21 Multi-Stage Fracture 3330.20 3330.30 0
2017-12-21 Multi-Stage Fracture 3307.70 3307.80 0
2017-12-21 Multi-Stage Fracture 3285.00 3285.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-19 2017-12-22 2,433 5,808 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 85.3133 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 11.4647 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 2.8362 N/A
ALPHA 150 BJ Services Bactericide/Biocide Glutaraldehyde 111-30-8 100 0.0248 N/A
Methanol 67-56-1 100 0.0002 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0003 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0597 N/A
Non-hazardous Not Available 100 0.0597 N/A
Water 7732-18-5 100 0.0597 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0545 N/A
Isopropanol 67-63-0 100 0.0545 N/A
Methanol 67-56-1 100 0.0545 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.1931 N/A
Oxyalkylated alcohol 9014 100 0.1931 N/A
Petroleum distillates 64742-47-8 100 0.1931 N/A
Polyacrylate 9014 100 0.1931 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-20 2017-12-23 Groundwater - Non-saline less than or equal to 150m deep 5598

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7608 0.0 0.0 0.0
2019 7390 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-15 No Incident Encountered 0.00 0.00
2018-01-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References