X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375081408002

Well Details

Well ID: 0375081408002
Loading map...
Location: 00/08-14-037-08W5/2
Location Alias: 00/08-14-37-08 W5M
Location Alias 2: 00/08-14-037-08 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 08
Section: 14
County/Municipality: Clearwater County
Well Name: CVE CHEDDER 8-14-37-8
Operator Name: Cenovus Energy Inc.
License Number: 0145453
License Date: 1990-09-18
License Status: Suspension
Spud Date: 1990-09-27
Final Drill Date: 1990-11-04
Well Total Depth: 2812.00 m
Surface Hole Latitude: 52.180273
Surface Hole Longitude: -115.026217

For data sources see[1][2]

Well History

Date Event
1990-09-18 Obtained License
1990-09-29 Surface Casing Operation Performed
1990-10-17 Direction Drilling Operation Performed - Deviate
1990-11-04 Finished Drilling
1990-11-04 Well Log Performed
1990-11-04 Well Mode changed to Drilled and Cased
1990-11-06 Production Casing Operation Performed
1990-11-07 Rig Released
1990-11-09 Well Log Performed
1990-12-07 Perforation Treatment Performed - Jet Perforation
1990-12-08 Perforation Treatment Performed - Fractured
1991-02-04 Well Began Production
1991-02-04 Well Fluid changed to Crude Oil
1991-02-04 Well Mode changed to Flowing
1995-09-10 Well Log Performed
1995-09-11 Well Log Performed
1996-04-09 Well Began Injection
1996-04-09 Well Fluid changed to Water
1996-04-09 Well Type changed to Injection
2004-02-01 Well Fluid changed to Water
2004-02-01 Well Mode changed to Suspended
2004-02-01 Well Type changed to Injection
2011-09-09 Perforation Treatment Performed - Cement Squeeze
2011-09-09 Plug Back Performed
2011-09-09 Well Fluid changed to Water
2011-09-09 Well Mode changed to Abandoned Zone
2011-09-09 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-10-17 1446.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-12-07 Perforation 2754.50 2760.00 13
1990-12-08 Fracture 2754.50 2760.00 0
2011-09-09 Cement Squeeze 2754.50 2760.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 4631 0.0 0.0 0.0
1992 3402 0.0 0.0 0.0
1993 4256 0.0 0.0 0.0
1994 4485 0.0 0.0 0.0
1995 2454 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0

For data sources see[6]

References