If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375081209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.167065,"lon":-115.002038,"icon":""}]} |
Location: 00/09-12-037-08W5/0 | |
Location Alias: 00/09-12-37-08 W5M | |
Location Alias 2: 00/09-12-037-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 08 | |
Section: 12 | |
County/Municipality: Clearwater County | |
Well Name: CVE CAROL 9-12-37-8 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0212378 | |
License Date: 1998-01-20 | |
License Status: Abandoned | |
Spud Date: 1998-02-01 | |
Final Drill Date: 1998-02-12 | |
Well Total Depth: 2707.40 m | |
Surface Hole Latitude: 52.167065 | |
Surface Hole Longitude: -115.002038 |
Date | Event |
---|---|
1998-01-20 | Obtained License |
1998-02-01 | Lost Circulation Occurred |
1998-02-04 | Surface Casing Operation Performed |
1998-02-12 | Finished Drilling |
1998-02-12 | Well Mode changed to Drilled and Cased |
1998-02-13 | Well Log Performed |
1998-02-14 | Production Casing Operation Performed |
1998-02-15 | Rig Released |
1998-02-27 | Well Log Performed |
1998-02-28 | Well Log Performed |
1998-03-01 | Perforation Treatment Performed - Open-Hole Completion |
1998-03-01 | Well Log Performed |
1998-05-01 | Well Began Production |
1998-05-01 | Well Fluid changed to Crude Oil |
1998-05-01 | Well Mode changed to Flowing |
1998-05-25 | Well Log Performed |
1998-06-20 | Perforation Treatment Performed - Open-Hole Completion |
1998-06-22 | Well Log Performed |
1998-06-23 | Perforation Treatment Performed - Jet Perforation |
1999-03-26 | Well Log Performed |
1999-03-27 | Well Log Performed |
1999-05-21 | Well Began Injection |
1999-05-21 | Well Fluid changed to Water |
1999-05-21 | Well Type changed to Injection |
2004-02-01 | Well Fluid changed to Water |
2004-02-01 | Well Mode changed to Suspended |
2004-02-01 | Well Type changed to Injection |
2012-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-09-10 | Plug Back Performed |
2012-09-10 | Well Fluid changed to Water |
2012-09-10 | Well Log Performed |
2012-09-10 | Well Mode changed to Abandoned Zone |
2012-09-10 | Well Type changed to Injection |
2012-09-11 | Perforation Treatment Performed - Jet Perforation |
2012-09-11 | Well Log Performed |
2012-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-09-12 | Perforation Treatment Performed - Remedial Casing |
2012-09-13 | Perforation Treatment Performed - Jet Perforation |
2012-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-09-14 | Perforation Treatment Performed - Remedial Casing |
2012-10-12 | Well Abandoned |
2012-10-12 | Well Fluid changed to Water |
2012-10-12 | Well Mode changed to Abandoned |
2012-10-12 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-03-01 | Open Hole/Barefoot Completion | 2671.00 | 2705.20 | 0 |
2012-09-14 | Packing Device Capped w/Cement | 793.00 | 885.00 | 0 |
1998-06-20 | Open Hole/Barefoot Completion | 2671.00 | 2707.40 | 0 |
1998-06-23 | Perforation | 2685.00 | 2690.00 | 14 |
2012-09-10 | Packing Device Capped w/Cement | 2642.00 | 2650.00 | 0 |
2012-09-11 | Perforation | 1059.00 | 1060.00 | 17 |
2012-09-12 | Remedial Casing Cementing | 1059.00 | 1060.00 | 0 |
2012-09-12 | Packing Device Capped w/Cement | 1030.00 | 1050.00 | 0 |
2012-09-13 | Perforation | 895.00 | 896.00 | 17 |
2012-09-14 | Remedial Casing Cementing | 895.00 | 896.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 4390 | 0.0 | 0.0 | 0.0 |
1999 | 24 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1998-02-01 | Lost Circulation | 95.00 | 303.00 |
2012-10-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]