X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375071814000

Well Details

Well ID: 0375071814000
Loading map...
Location: 00/14-18-037-07W5/0
Location Alias: 00/14-18-37-07 W5M
Location Alias 2: 00/14-18-037-07 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 07
Section: 18
County/Municipality: Clearwater County
Well Name: CVE CHEDDER 14-18-37-7
Operator Name: Cenovus Energy Inc.
License Number: 0146403
License Date: 1990-11-20
License Status: Abandoned
Spud Date: 1990-11-28
Final Drill Date: 1990-12-19
Well Total Depth: 2680.00 m
Surface Hole Latitude: 52.184613
Surface Hole Longitude: -114.995048

For data sources see[1][2]

Well History

Date Event
1990-11-20 Obtained License
1990-12-02 Surface Casing Operation Performed
1990-12-11 Kick Occurred
1990-12-12 Lost Circulation Occurred
1990-12-16 Kick Occurred
1990-12-16 Lost Circulation Occurred
1990-12-19 Finished Drilling
1990-12-19 Well Mode changed to Drilled and Cased
1990-12-20 Well Log Performed
1990-12-21 Well Log Performed
1990-12-23 Production Casing Operation Performed
1990-12-24 Rig Released
1990-12-24 Well Log Performed
1991-01-27 Well Log Performed
1991-01-28 Well Log Performed
1991-01-29 Perforation Treatment Performed - Jet Perforation
1991-05-24 Well Began Production
1991-05-24 Well Fluid changed to Crude Oil
1991-05-24 Well Mode changed to Flowing
1991-08-20 Well Fluid changed to Crude Oil
1991-08-20 Well Mode changed to Suspended
2019-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-17 Perforation Treatment Performed - Jet Perforation
2019-09-17 Plug Back Performed
2019-09-17 Well Log Performed
2019-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-18 Perforation Treatment Performed - Cement Plug
2019-09-18 Perforation Treatment Performed - Cement Squeeze
2019-09-18 Perforation Treatment Performed - Jet Perforation
2019-09-18 Plug Back Performed
2019-09-18 Well Log Performed
2019-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-19 Perforation Treatment Performed - Cement Plug
2019-09-19 Plug Back Performed
2019-09-19 Well Fluid changed to Crude Oil
2019-09-19 Well Mode changed to Abandoned Zone
2019-10-07 Well Abandoned
2019-10-07 Well Fluid changed to Crude Oil
2019-10-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-29 Perforation 2505.00 2509.00 13
2019-09-17 Packing Device Capped w/Cement 2472.00 2480.00 0
2019-09-17 Perforation 1648.00 1649.00 17
2019-09-18 Cement Squeeze 1648.00 1649.00 0
2019-09-18 Cement Plug 1641.20 1649.00 0
2019-09-18 Packing Device Capped w/Cement 1631.30 1641.20 0
2019-09-18 Perforation 605.00 606.00 17
2019-09-19 Cement Plug 594.50 606.00 0
2019-09-19 Packing Device Capped w/Cement 581.90 593.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 2079 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-12-11 Kick 2523.00 2523.00
1990-12-12 Lost Circulation 2523.00 2523.00
1990-12-16 Kick 2629.00 2629.00
1990-12-16 Lost Circulation 2629.00 2637.00
2019-10-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References