X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375043516000

Well Details

Well ID: 0375043516000
Loading map...
Location: 00/16-35-037-04W5/0
Location Alias: 00/16-35-37-04 W5M
Location Alias 2: 00/16-35-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 35
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 16-35-37-4
Operator Name: Cenovus Energy Inc.
License Number: 0124463
License Date: 1986-11-20
License Status: Issued
Spud Date: 1986-11-24
Final Drill Date: 1986-12-04
Well Total Depth: 2385.00 m
Surface Hole Latitude: 52.231122
Surface Hole Longitude: -114.459557

For data sources see[1][2]

Well History

Date Event
1986-11-20 Obtained License
1986-11-25 Lost Circulation Occurred
1986-11-25 Surface Casing Operation Performed
1986-12-04 Finished Drilling
1986-12-04 Well Mode changed to Drilled and Cased
1986-12-05 Drill Stem Test Performed
1986-12-05 Well Log Performed
1986-12-07 Drill Stem Test Performed
1986-12-10 Lost Circulation Occurred
1986-12-10 Production Casing Operation Performed
1986-12-11 Rig Released
1987-01-03 Well Log Performed
1987-01-05 Perforation Treatment Performed - Jet Perforation
1987-01-05 Well Log Performed
1987-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-01-11 Plug Back Performed
1987-01-11 Well Log Performed
1987-01-12 Perforation Treatment Performed - Fractured
1987-01-12 Perforation Treatment Performed - Jet Perforation
1987-02-01 Well Began Production
1987-02-01 Well Fluid changed to Crude Oil
1987-02-01 Well Mode changed to Flowing
1987-03-13 Well Fluid changed to Crude Oil
1987-03-13 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-01-05 Perforation 2339.00 2342.00 13
1987-01-08 Acid Treatment 2339.00 2342.00 0
1987-01-11 Packing Device Capped w/Cement 2325.70 2333.70 0
1987-01-12 Perforation 2270.00 2277.00 13
1987-01-12 Fracture 2270.00 2277.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 5141 0.0 0.0 0.0
1988 2756 0.0 0.0 0.0
1989 7748 0.0 0.0 0.0
1990 8349 0.0 0.0 0.0
1991 8596 0.0 0.0 0.0
1992 8644 0.0 0.0 0.0
1993 8543 0.0 0.0 0.0
1994 8551 0.0 0.0 0.0
1995 8240 0.0 0.0 0.0
1996 2713 0.0 0.0 0.0
1997 6085 0.0 0.0 0.0
1998 8038 0.0 0.0 0.0
1999 8201 0.0 0.0 0.0
2000 8396 0.0 0.0 0.0
2001 8263 0.0 0.0 0.0
2002 8713 0.0 0.0 0.0
2003 8323 0.0 0.0 0.0
2004 8447 0.0 0.0 0.0
2005 8340 0.0 0.0 0.0
2006 8704 0.0 0.0 0.0
2007 8739 0.0 0.0 0.0
2008 8475 0.0 0.0 0.0
2009 8744 0.0 0.0 0.0
2010 8703 0.0 0.0 0.0
2011 8656 0.0 0.0 0.0
2012 7144 0.0 0.0 0.0
2013 8686 0.0 0.0 0.0
2014 8582 0.0 0.0 0.0
2015 8304 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 1344 0.0 0.0 0.0
2018 7664 0.0 0.0 0.0
2019 7431 0.0 0.0 0.0
2020 2120 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-11-25 Lost Circulation 228.00 228.00
1986-12-10 Lost Circulation 2385.00 2385.00

For data sources see[6]

References