X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375043506002

Well Details

Well ID: 0375043506002
Loading map...
Location: 00/06-35-037-04W5/2
Location Alias: 00/06-35-37-04 W5M
Location Alias 2: 00/06-35-037-04 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 35
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 6-35-37-4
Operator Name: Cenovus Energy Inc.
License Number: 0097270
License Date: 1982-09-03
License Status: Abandoned
Spud Date: 1982-09-10
Final Drill Date: 1982-09-22
Well Total Depth: 2398.00 m
Surface Hole Latitude: 52.224079
Surface Hole Longitude: -114.468342

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-09-03 Obtained License
1982-09-22 Finished Drilling
1982-09-24 Well Log Performed
1982-09-26 Drill Stem Test Performed
1982-09-29 Drill Stem Test Performed
1982-10-01 Production Casing Operation Performed
1982-10-15 Perforation Treatment Performed - Jet Perforation
1982-10-18 Perforation Treatment Performed - Jet Perforation
1982-10-22 Perforation Treatment Performed - Jet Perforation
1982-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-10-27 Perforation Treatment Performed - Jet Perforation
1982-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-10-31 Perforation Treatment Performed - Jet Perforation
1982-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-05-28 Perforation Treatment Performed - Jet Perforation
1983-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-08-30 Perforation Treatment Performed - Jet Perforation
1983-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-01 Perforation Treatment Performed - Fractured
1983-12-12 Well Log Performed
1983-12-13 Perforation Treatment Performed - Fractured
1983-12-14 Well Mode changed to Drilled and Cased
1985-07-26 Well Fluid changed to Crude Oil
1985-07-26 Well Log Performed
1985-07-26 Well Mode changed to Potential
1985-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-27 Plug Back Performed
1985-07-27 Well Fluid changed to Crude Oil
1985-07-27 Well Log Performed
1985-07-27 Well Mode changed to Abandoned Zone
1985-07-28 Perforation Treatment Performed - Jet Perforation
1985-07-29 Perforation Treatment Performed - Fractured
1985-07-31 Well Log Performed
2003-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-28 Plug Back Performed
2003-11-02 Perforation Treatment Performed - Jet Perforation
2003-11-02 Well Log Performed
2003-11-04 Perforation Treatment Performed - Fractured
2014-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-08-07 Perforation Treatment Performed - Jet Perforation
2014-08-07 Plug Back Performed
2014-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-08-08 Perforation Treatment Performed - Remedial Casing
2016-06-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-15 Perforation 2358.00 2362.00 7
1982-11-01 Acid Treatment 2308.00 2309.50 0
1983-05-28 Perforation 2305.50 2306.50 14
1983-08-30 Packing Device Capped w/Cement 2292.00 2300.00 0
1983-08-30 Perforation 2070.00 2072.50 7
1983-08-30 Perforation 2073.50 2074.00 7
1983-08-30 Perforation 2075.50 2076.00 7
1983-08-31 Acid Treatment 2070.00 2076.00 0
1983-09-01 Fracture 2070.00 2076.00 0
1983-12-13 Fracture 2070.00 2076.00 0
1985-07-27 Packing Device Capped w/Cement 2059.00 2067.00 0
1982-10-18 Perforation 2350.00 2352.00 7
1985-07-28 Perforation 1788.20 1792.20 13
1985-07-28 Perforation 1789.00 1793.00 13
1985-07-29 Fracture 1788.20 1793.00 0
2003-10-28 Packing Device Capped w/Cement 1770.20 1778.20 0
2003-11-02 Perforation 1237.00 1247.00 17
2003-11-04 Fracture 1237.00 1247.00 0
2014-08-07 Packing Device Capped w/Cement 1223.00 1231.00 0
2014-08-07 Perforation 289.00 290.00 14
2014-08-08 Remedial Casing Cementing 289.00 290.00 0
2014-08-08 Packing Device Capped w/Cement 263.00 282.00 0
1982-10-22 Perforation 2345.00 2347.00 7
1982-10-23 Acid Treatment 2345.00 2347.00 0
1982-10-27 Packing Device Capped w/Cement 2342.00 2344.00 0
1982-10-27 Perforation 2333.50 2336.00 13
1982-10-28 Acid Treatment 2333.50 2336.00 0
1982-10-30 Packing Device Capped w/Cement 2328.00 2332.00 0
1982-10-31 Perforation 2308.00 2309.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 360 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References