X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375043502000

Well Details

Well ID: 0375043502000
Loading map...
Location: 00/02-35-037-04W5/0
Location Alias: 00/02-35-37-04 W5M
Location Alias 2: 00/02-35-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 35
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 2-35-37-4
Operator Name: Cenovus Energy Inc.
License Number: 0024584
License Date: 1963-07-29
License Status: Abandoned
Spud Date: 1963-07-31
Final Drill Date: 1963-08-18
Well Total Depth: 2412.50 m
Surface Hole Latitude: 52.218616
Surface Hole Longitude: -114.462198

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-07-29 Obtained License
1963-08-14 Drill Stem Test Performed
1963-08-18 Finished Drilling
1963-08-18 Well Mode changed to Drilled and Cased
1963-08-19 Drill Stem Test Performed
1963-08-20 Drill Stem Test Performed
1963-08-21 Drill Stem Test Performed
1963-08-22 Production Casing Operation Performed
1963-08-26 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-29 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-08-30 Perforation Treatment Performed - Fractured
1963-10-01 Well Began Production
1963-10-01 Well Fluid changed to Crude Oil
1963-10-01 Well Mode changed to Flowing
1964-06-13 Perforation Treatment Performed - Cement Squeeze
1964-06-13 Well Fluid changed to Crude Oil
1964-06-13 Well Mode changed to Suspended
1964-06-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-16 Perforation Treatment Performed - Acid Wash - No Pressure
1965-11-12 Perforation Treatment Performed - Cement Squeeze
1965-11-23 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-29 Perforation Treatment Performed - Fractured
1966-08-08 Perforation Treatment Performed - Fractured
1966-08-22 Well Fluid changed to Crude Oil
1966-08-22 Well Mode changed to Flowing
1967-02-13 Well Fluid changed to Crude Oil
1967-02-13 Well Mode changed to Suspended
1967-11-20 Well Fluid changed to Crude Oil
1967-11-20 Well Mode changed to Flowing
1970-03-01 Well Fluid changed to Crude Oil
1970-03-01 Well Mode changed to Suspended
1985-10-01 Well Log Performed
1985-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-10-02 Plug Back Performed
1985-10-02 Well Fluid changed to Crude Oil
1985-10-02 Well Log Performed
1985-10-02 Well Mode changed to Abandoned Zone
1985-10-03 Perforation Treatment Performed - Jet Perforation
1985-10-05 Perforation Treatment Performed - Fractured
1985-10-08 Well Log Performed
1997-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-30 Perforation Treatment Performed - Jet Perforation
1997-10-30 Perforation Treatment Performed - Remedial Casing
1997-10-30 Plug Back Performed
1997-10-30 Well Log Performed
2002-06-16 Perforation Treatment Performed - Jet Perforation
2002-06-19 Perforation Treatment Performed - Cement Squeeze
2002-06-19 Plug Back Performed
2002-06-21 Perforation Treatment Performed - Jet Perforation
2002-06-23 Perforation Treatment Performed - Cement Squeeze
2002-06-23 Plug Back Performed
2013-12-05 Well Log Performed
2015-06-10 Well Log Performed
2015-06-12 Well Log Performed
2015-06-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-08-26 Hydra Jet Perforation 2282.30 2282.30 0
1964-06-15 Hydra Jet Perforation 2251.90 2251.90 0
1964-06-16 Acid Wash 2248.80 2251.90 0
1964-06-16 Acid Treatment 2248.80 2251.90 0
1965-11-12 Cement Squeeze 2248.80 2251.90 0
1965-11-23 Hydra Jet Perforation 2282.30 2282.30 0
1965-11-23 Hydra Jet Perforation 2283.00 2283.00 0
1965-11-23 Hydra Jet Perforation 2283.60 2283.60 0
1965-11-23 Acid Treatment 2282.30 2283.60 0
1965-11-29 Fracture 2282.30 2283.60 0
1966-08-08 Fracture 2282.30 2283.60 0
1963-08-26 Hydra Jet Perforation 2283.30 2283.30 0
1985-10-02 Packing Device Capped w/Cement 2232.00 2240.00 0
1985-10-03 Perforation 1792.00 1798.00 13
1985-10-05 Fracture 1792.00 1798.00 0
1997-10-30 Packing Device Capped w/Cement 1771.00 1779.00 0
1997-10-30 Perforation 460.00 461.00 13
1997-10-30 Remedial Casing Cementing 460.00 461.00 0
2002-06-16 Perforation 1792.00 1798.00 17
2002-06-19 Cement Squeeze 1792.00 1798.00 0
2002-06-21 Perforation 2282.00 2293.00 17
2002-06-21 Perforation 2249.00 2252.00 17
1963-08-26 Hydra Jet Perforation 2292.40 2292.40 0
2002-06-23 Cement Squeeze 2282.00 2293.00 0
2002-06-23 Cement Squeeze 2249.00 2252.00 0
1963-08-27 Acid Treatment 2282.30 2292.40 0
1963-08-29 Hydra Jet Perforation 2277.50 2277.50 0
1963-08-30 Fracture 2277.50 2292.40 0
1964-06-13 Cement Squeeze 2277.50 2292.40 0
1964-06-15 Hydra Jet Perforation 2248.80 2248.80 0
1964-06-15 Hydra Jet Perforation 2250.00 2250.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 3239 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-07-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References