X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375042416000

Well Details

Well ID: 0375042416000
Loading map...
Location: 00/16-24-037-04W5/0
Location Alias: 00/16-24-37-04 W5M
Location Alias 2: 00/16-24-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 24
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 16-24-37-4
Operator Name: Cenovus Energy Inc.
License Number: 0146895
License Date: 1990-12-12
License Status: Amended
Spud Date: 1990-12-14
Final Drill Date: 1990-12-24
Well Total Depth: 2319.00 m
Surface Hole Latitude: 52.201216
Surface Hole Longitude: -114.433903

For data sources see[1][2]

Well History

Date Event
1990-12-12 Obtained License
1990-12-15 Surface Casing Operation Performed
1990-12-24 Finished Drilling
1990-12-24 Well Mode changed to Drilled and Cased
1990-12-25 Well Log Performed
1990-12-26 Drill Stem Test Performed
1990-12-28 Drill Stem Test Performed
1990-12-29 Drill Stem Test Performed
1990-12-31 Production Casing Operation Performed
1990-12-31 Rig Released
1991-01-30 Well Log Performed
1991-01-31 Well Log Performed
1991-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-01 Perforation Treatment Performed - Jet Perforation
1991-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-02 Perforation Treatment Performed - Cement Squeeze
1991-02-04 Well Log Performed
1991-02-06 Perforation Treatment Performed - Selective Jet Perforations
1991-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-11 Well Began Production
1991-02-11 Well Fluid changed to Crude Oil
1991-02-11 Well Mode changed to Flowing
1991-06-06 Well Fluid changed to Crude Oil
1991-06-06 Well Mode changed to Pumping
1991-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-23 Perforation Treatment Performed - Cement Squeeze
1993-03-23 Well Log Performed
1993-03-24 Perforation Treatment Performed - Jet Perforation
1993-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-14 Perforation Treatment Performed - Jet Perforation
1995-02-14 Well Log Performed
1995-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-19 Perforation Treatment Performed - Jet Perforation
1995-05-19 Well Log Performed
1995-08-09 Well Log Performed
1995-08-31 Well Log Performed
1996-04-01 Well Log Performed
1996-04-02 Perforation Treatment Performed - Cement Squeeze
1996-04-02 Plug Back Performed
1996-04-08 Well Log Performed
1996-04-09 Perforation Treatment Performed - Jet Perforation
1996-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-02-01 Perforation 2276.00 2277.00 13
1991-02-07 Acid Treatment 2281.50 2288.00 0
1991-11-30 Acid Treatment 2281.50 2288.00 0
1993-03-23 Cement Squeeze 2281.50 2288.00 0
1993-03-24 Perforation 2275.50 2276.50 16
1993-03-24 Perforation 2277.50 2279.50 16
1993-03-24 Perforation 2281.00 2283.50 16
1993-03-25 Acid Treatment 2275.50 2283.50 0
1993-03-27 Acid Treatment 2277.50 2283.50 0
1993-06-24 Acid Treatment 2275.50 2283.50 0
1995-02-14 Perforation 2272.00 2274.00 17
1991-02-01 Acid Treatment 2276.00 2277.00 0
1995-02-14 Perforation 2275.50 2276.50 17
1995-05-19 Perforation 2294.00 2296.00 17
1995-05-19 Perforation 2297.00 2299.00 17
1995-05-19 Acid Treatment 2294.00 2299.00 0
1996-04-02 Cement Squeeze 2272.00 2274.00 0
1996-04-09 Perforation 2294.00 2297.00 17
1996-04-09 Perforation 2277.00 2280.00 17
1996-04-10 Acid Treatment 2277.00 2297.00 0
1991-02-02 Acid Treatment 2276.00 2277.00 0
1991-02-02 Cement Squeeze 2276.00 2277.00 0
1991-02-06 Selective Jet Perforations 2281.50 2281.50 1
1991-02-06 Selective Jet Perforations 2282.50 2282.50 1
1991-02-06 Selective Jet Perforations 2283.50 2283.50 2
1991-02-06 Selective Jet Perforations 2287.50 2287.50 1
1991-02-06 Selective Jet Perforations 2288.00 2288.00 2

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 7275 0.0 0.0 0.0
1992 8196 0.0 0.0 0.0
1993 8155 0.0 0.0 0.0
1994 6156 0.0 0.0 0.0
1995 3387 0.0 0.0 0.0
1996 7852 0.0 0.0 0.0
1997 7920 0.0 0.0 0.0
1998 8498 0.0 0.0 0.0
1999 8236 0.0 0.0 0.0
2000 8749 0.0 0.0 0.0
2001 8747 0.0 0.0 0.0
2002 8686 0.0 0.0 0.0
2003 8639 0.0 0.0 0.0
2004 8693 0.0 0.0 0.0
2005 8615 0.0 0.0 0.0
2006 8176 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8144 0.0 0.0 0.0
2009 4562 0.0 0.0 0.0
2010 8516 0.0 0.0 0.0
2011 6899 0.0 0.0 0.0
2012 5590 0.0 0.0 0.0
2013 4755 0.0 0.0 0.0
2014 3917 0.0 0.0 0.0
2015 1247 0.0 0.0 0.0
2016 7530 0.0 0.0 0.0
2017 7322 0.0 0.0 0.0
2018 8026 0.0 0.0 0.0
2019 8431 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

References