X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375042410000

Well Details

Well ID: 0375042410000
Loading map...
Location: 00/10-24-037-04W5/0
Location Alias: 00/10-24-37-04 W5M
Location Alias 2: 00/10-24-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 24
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 10-24-37-4
Operator Name: Cenovus Energy Inc.
License Number: 0025329
License Date: 1963-12-16
License Status: RecCertified
Spud Date: 1963-12-29
Final Drill Date: 1964-01-12
Well Total Depth: 2394.20 m
Surface Hole Latitude: 52.197144
Surface Hole Longitude: -114.439078

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-12-16 Obtained License
1964-01-12 Finished Drilling
1964-01-12 Well Mode changed to Drilled and Cased
1964-01-14 Drill Stem Test Performed
1964-01-15 Production Casing Operation Performed
1964-01-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-22 Well Began Production
1964-01-22 Well Fluid changed to Crude Oil
1964-01-22 Well Mode changed to Flowing
1965-11-11 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-11-11 Well Fluid changed to Crude Oil
1965-11-11 Well Mode changed to Suspended
1965-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-12 Perforation Treatment Performed - Fractured
1970-01-06 Perforation Treatment Performed - Abrasa-Jet Perforation
1970-01-06 Perforation Treatment Performed - Cement Squeeze
1970-01-11 Well Fluid changed to Crude Oil
1970-01-11 Well Mode changed to Flowing
1989-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-21 Perforation Treatment Performed - Jet Perforation
1993-01-21 Well Log Performed
1993-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-04 Perforation Treatment Performed - Jet Perforation
1993-02-04 Well Log Performed
1993-03-01 Well Log Performed
1994-06-13 Well Log Performed
1994-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-06 Perforation Treatment Performed - Jet Perforation
1996-02-06 Well Fluid changed to Crude Oil
1996-02-06 Well Mode changed to Flowing
1996-02-09 Perforation Treatment Performed - Fractured
1998-09-23 Well Log Performed
1998-09-24 Well Log Performed
1998-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-25 Perforation Treatment Performed - Jet Perforation
1998-09-25 Plug Back Performed
1998-09-25 Well Fluid changed to Crude Oil
1998-09-25 Well Mode changed to Abandoned Zone
1998-09-26 Perforation Treatment Performed - Remedial Casing
1998-10-06 Well Abandoned
1998-10-06 Well Fluid changed to Crude Oil
1998-10-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-01-18 Hydra Jet Perforation 2297.30 2297.30 0
1989-09-28 Acid Treatment 2297.30 2297.30 0
1993-01-21 Perforation 2294.50 2295.80 13
1993-01-25 Acid Treatment 2294.50 2297.30 0
1993-02-04 Perforation 2290.60 2293.60 13
1994-06-15 Acid Treatment 2290.60 2297.30 0
1996-02-06 Perforation 1772.40 1778.40 17
1996-02-09 Fracture 1772.40 1778.40 0
1998-09-25 Packing Device Capped w/Cement 2256.00 2264.00 0
1998-09-25 Packing Device Capped w/Cement 1757.00 1765.00 0
1998-09-25 Perforation 511.80 512.80 13
1964-01-21 Acid Treatment 2297.30 2297.30 0
1998-09-26 Remedial Casing Cementing 511.80 512.80 0
1965-11-11 Packing Device Capped w/Cement 2255.50 2263.40 0
1965-11-11 Hydra Jet Perforation 1774.20 1776.70 0
1965-11-11 Hydra Jet Perforation 1777.60 1777.60 0
1965-11-12 Acid Treatment 1774.20 1777.60 0
1965-11-12 Fracture 1774.20 1777.60 0
1970-01-06 Cement Squeeze 1773.90 1777.90 0
1970-01-06 Hydra Jet Perforation 2297.30 2297.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 1957 0.0 0.0 0.0
1971 2600 0.0 0.0 0.0
1972 2976 0.0 0.0 0.0
1973 5030 0.0 0.0 0.0
1974 1496 0.0 0.0 0.0
1975 1522 0.0 0.0 0.0
1976 1571 0.0 0.0 0.0
1977 1248 0.0 0.0 0.0
1978 1924 0.0 0.0 0.0
1979 1994 0.0 0.0 0.0
1980 2272 0.0 0.0 0.0
1981 2628 0.0 0.0 0.0
1982 3000 0.0 0.0 0.0
1983 5788 0.0 0.0 0.0
1984 8734 0.0 0.0 0.0
1985 5855 0.0 0.0 0.0
1986 8744 0.0 0.0 0.0
1987 6308 0.0 0.0 0.0
1988 8567 0.0 0.0 0.0
1989 8710 0.0 0.0 0.0
1990 8759 0.0 0.0 0.0
1991 3761 0.0 0.0 0.0
1992 8566 0.0 0.0 0.0
1993 7882 0.0 0.0 0.0
1994 7912 0.0 0.0 0.0
1995 336 0.0 0.0 0.0

For data sources see[5]

References