X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375041316002

Well Details

Well ID: 0375041316002
Loading map...
Location: 00/16-13-037-04W5/2
Location Alias: 00/16-13-37-04 W5M
Location Alias 2: 00/16-13-037-04 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 13
County/Municipality: Clearwater County
Well Name: CVE GARR 16-13-37-4
Operator Name: Cenovus Energy Inc.
License Number: 0102857
License Date: 1983-08-25
License Status: Abandoned
Spud Date: 1983-08-31
Final Drill Date: 1983-09-21
Well Total Depth: 2402.00 m
Surface Hole Latitude: 52.184957
Surface Hole Longitude: -114.435221

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-08-25 Obtained License
1983-09-21 Finished Drilling
1983-09-21 Well Mode changed to Drilled and Cased
1983-09-22 Drill Stem Test Performed
1983-09-23 Drill Stem Test Performed
1983-09-26 Drill Stem Test Performed
1983-09-27 Drill Stem Test Performed
1983-09-30 Production Casing Operation Performed
1983-12-13 Well Log Performed
1983-12-14 Well Log Performed
1983-12-15 Perforation Treatment Performed - Jet Perforation
1992-05-01 Well Log Performed
1992-05-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-05-02 Plug Back Performed
1992-05-05 Well Log Performed
1992-05-06 Perforation Treatment Performed - Fractured
1992-05-06 Perforation Treatment Performed - Jet Perforation
1992-11-04 Perforation Treatment Performed - Fractured
1992-11-12 Well Began Production
1992-11-12 Well Fluid changed to Gas
1992-11-12 Well Mode changed to Flowing
1995-12-01 Perforation Treatment Performed - Cement Squeeze
1995-12-01 Plug Back Performed
1995-12-01 Well Fluid changed to Gas
1995-12-01 Well Mode changed to Abandoned Zone
1995-12-02 Perforation Treatment Performed - Jet Perforation
1995-12-05 Perforation Treatment Performed - Cement Squeeze
1995-12-05 Plug Back Performed
1995-12-06 Well Log Performed
1995-12-07 Perforation Treatment Performed - Jet Perforation
1995-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-10 Perforation Treatment Performed - Jet Perforation
1996-04-10 Well Log Performed
1996-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-10-04 Well Log Performed
2008-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-05 Perforation Treatment Performed - Jet Perforation
2008-10-05 Plug Back Performed
2008-10-05 Well Log Performed
2008-10-07 Perforation Treatment Performed - Jet Perforation
2008-10-07 Perforation Treatment Performed - Remedial Casing
2008-10-07 Well Log Performed
2008-10-08 Perforation Treatment Performed - Jet Perforation
2008-10-08 Perforation Treatment Performed - Remedial Casing
2008-10-08 Well Log Performed
2008-10-09 Perforation Treatment Performed - Remedial Casing
2008-10-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-12-15 Perforation 2297.00 2298.50 13
1995-12-07 Perforation 2319.50 2320.50 17
1995-12-08 Acid Treatment 2316.00 2318.00 0
1996-04-10 Perforation 2316.00 2322.00 17
1996-04-11 Acid Treatment 2316.00 2322.00 0
2008-10-05 Packing Device Capped w/Cement 2283.00 2291.00 0
2008-10-05 Packing Device Capped w/Cement 2262.00 2270.00 0
2008-10-05 Packing Device Capped w/Cement 2302.00 2310.00 0
2008-10-05 Perforation 1789.00 1790.00 20
2008-10-07 Remedial Casing Cementing 1789.00 1790.00 0
2008-10-07 Perforation 1179.00 1180.00 20
1992-05-02 Packing Device Capped w/Cement 2290.00 2293.00 0
2008-10-08 Remedial Casing Cementing 1179.00 1180.00 0
2008-10-08 Perforation 590.00 591.00 20
2008-10-09 Remedial Casing Cementing 590.00 591.00 0
1992-05-06 Perforation 2276.00 2280.00 20
1992-05-06 Fracture 2276.00 2280.00 0
1992-11-04 Fracture 2276.00 2280.00 0
1995-12-01 Cement Squeeze 2276.00 2280.00 0
1995-12-02 Perforation 2297.00 2298.50 13
1995-12-05 Cement Squeeze 2297.00 2298.50 0
1995-12-07 Perforation 2316.00 2318.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 609 0.0 0.0 0.0
1993 7087 0.0 0.0 0.0
1994 8100 0.0 0.0 0.0
1995 7787 0.0 0.0 0.0

For data sources see[5]

References