If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375040911000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.169397,"lon":-114.51829,"icon":""}]} |
Location: 00/11-09-037-04W5/0 | |
Location Alias: 00/11-09-37-04 W5M | |
Location Alias 2: 00/11-09-037-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 04 | |
Section: 09 | |
County/Municipality: Clearwater County | |
Well Name: AMOCO B-1 SYLAKE 11-9-37-4 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0055633 | |
License Date: 1975-10-31 | |
License Status: RecCertified | |
Spud Date: 1975-11-07 | |
Final Drill Date: 1975-11-27 | |
Well Total Depth: 2432.30 m | |
Surface Hole Latitude: 52.169397 | |
Surface Hole Longitude: -114.518290 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-10-31 | Obtained License |
1975-11-27 | Finished Drilling |
1975-11-27 | Well Mode changed to Drilled and Cased |
1975-11-29 | Drill Stem Test Performed |
1975-12-03 | Drill Stem Test Performed |
1975-12-06 | Production Casing Operation Performed |
1975-12-17 | Perforation Treatment Performed - Jet Perforation |
1975-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-12-21 | Perforation Treatment Performed - Cement Squeeze |
1975-12-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-12-22 | Perforation Treatment Performed - Jet Perforation |
1975-12-30 | Perforation Treatment Performed - Cement Squeeze |
1976-01-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-01-03 | Perforation Treatment Performed - Jet Perforation |
1976-01-07 | Perforation Treatment Performed - Cement Squeeze |
1976-01-08 | Perforation Treatment Performed - Jet Perforation |
1976-01-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-03-03 | Perforation Treatment Performed - Cement Plug |
1976-03-18 | Well Fluid changed to Crude Oil |
1976-03-18 | Well Mode changed to Potential |
1976-03-19 | Well Abandoned |
1976-03-19 | Well Fluid changed to Crude Oil |
1976-03-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-12-17 | Perforation | 2401.20 | 2404.30 | 13 |
1976-01-08 | Perforation | 2340.60 | 2341.80 | 7 |
1976-01-08 | Perforation | 2345.70 | 2348.80 | 7 |
1976-01-09 | Acid Treatment | 2340.60 | 2345.70 | 0 |
1976-03-03 | Cement Plug | 2313.40 | 2365.20 | 0 |
1975-12-18 | Acid Treatment | 2401.20 | 2404.30 | 0 |
1975-12-21 | Cement Squeeze | 2401.20 | 2404.30 | 0 |
1975-12-22 | Perforation | 2392.70 | 2395.70 | 13 |
1975-12-22 | Acid Treatment | 2392.70 | 2395.70 | 0 |
1975-12-30 | Cement Squeeze | 2392.70 | 2395.70 | 0 |
1976-01-03 | Perforation | 2387.80 | 2389.90 | 13 |
1976-01-03 | Acid Treatment | 2387.80 | 2389.90 | 0 |
1976-01-07 | Cement Squeeze | 2387.80 | 2389.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[5]