X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033311003

Well Details

Well ID: 0375033311003
Loading map...
Location: 00/11-33-037-03W5/3
Location Alias: 00/11-33-37-03 W5M
Location Alias 2: 00/11-33-037-03 W5/03
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 33
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 11-33-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0141620
License Date: 1989-11-02
License Status: Suspension
Spud Date: 1989-11-05
Final Drill Date: 1994-03-06
Well Total Depth: 2322.00 m
Surface Hole Latitude: 52.225978
Surface Hole Longitude: -114.372495

For data sources see[1][2]

Well History

Date Event
1989-11-02 Obtained License
1989-11-06 Surface Casing Operation Performed
1989-11-24 Intermediate Casing Operation Performed
1994-02-22 Direction Drilling Operation Performed - Deviate
1994-03-06 Finished Drilling
1994-03-06 Well Mode changed to Drilled and Cased
1994-03-07 Well Log Performed
1994-03-09 Well Log Performed
1994-03-11 Liner Casing Operation Performed
1994-03-11 Rig Released
1994-03-15 Perforation Treatment Performed - Jet Perforation
1994-03-15 Well Log Performed
1994-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-27 Perforation Treatment Performed - Cement Squeeze
1994-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-31 Perforation Treatment Performed - Jet Perforation
1994-05-31 Well Log Performed
1994-08-23 Perforation Treatment Performed - Jet Perforation
1994-09-15 Well Began Production
1994-09-15 Well Fluid changed to Crude Oil
1994-09-15 Well Mode changed to Pumping
1995-05-01 Well Fluid changed to Crude Oil
1995-05-01 Well Mode changed to Suspended
1997-03-21 Perforation Treatment Performed - Cement Squeeze
1997-03-21 Plug Back Performed
1997-03-21 Well Fluid changed to Crude Oil
1997-03-21 Well Mode changed to Abandoned Zone
1997-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-27 Perforation Treatment Performed - Jet Perforation
1997-03-27 Well Log Performed
2008-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-05 Plug Back Performed
2008-09-05 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-02-22 1803.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-15 Perforation 2264.50 2265.50 13
1994-08-23 Perforation 1832.50 1838.50 13
1997-03-21 Cement Squeeze 1787.00 1838.50 0
1997-03-27 Perforation 2261.00 2264.50 13
1997-03-27 Acid Treatment 2259.00 2264.50 0
2008-09-05 Packing Device Capped w/Cement 2245.00 2253.00 0
1994-03-16 Acid Treatment 2264.50 2265.50 0
1994-05-27 Cement Squeeze 2264.50 2265.50 0
1994-05-31 Perforation 2259.00 2261.00 13
1994-05-31 Acid Treatment 2259.00 2261.00 0
1994-08-23 Perforation 1787.00 1793.00 13
1994-08-23 Perforation 1795.00 1801.00 13
1994-08-23 Perforation 1807.00 1813.00 13
1994-08-23 Perforation 1815.00 1821.00 13

For data sources see[5]



References