X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033303000

Well Details

Well ID: 0375033303000
Loading map...
Location: 00/03-33-037-03W5/0
Location Alias: 00/03-33-37-03 W5M
Location Alias 2: 00/03-33-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 33
County/Municipality: Red Deer County
Well Name: AZTEC SYLVAN LAKE 3-33-37-3
Operator Name: Enerplus Corporation
License Number: 0163164
License Date: 1993-12-13
License Status: RecCertified
Spud Date: 1993-12-18
Final Drill Date: 1994-01-09
Well Total Depth: 2293.00 m
Surface Hole Latitude: 52.219983
Surface Hole Longitude: -114.371978

For data sources see[1][2]

Well History

Date Event
1993-01-11 Well Log Performed
1993-12-13 Obtained License
1993-12-18 Well Log Performed
1993-12-19 Surface Casing Operation Performed
1994-01-02 Direction Drilling Operation Performed - Deviate
1994-01-09 Finished Drilling
1994-01-09 Well Mode changed to Drilled and Cased
1994-01-11 Well Log Performed
1994-01-12 Production Casing Operation Performed
1994-01-12 Rig Released
1994-01-27 Well Log Performed
1994-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-29 Perforation Treatment Performed - Jet Perforation
1994-01-29 Well Log Performed
1994-02-28 Well Began Production
1994-02-28 Well Fluid changed to Crude Oil
1994-02-28 Well Mode changed to Pumping
1994-06-29 Perforation Treatment Performed - Cement Squeeze
1994-07-05 Perforation Treatment Performed - Jet Perforation
1994-07-05 Well Log Performed
1994-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-30 Well Fluid changed to Crude Oil
1996-09-30 Well Mode changed to Suspended
1998-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-14 Perforation Treatment Performed - Jet Perforation
1998-09-14 Plug Back Performed
1998-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-23 Perforation Treatment Performed - Jet Perforation
1998-09-23 Plug Back Performed
1998-09-23 Well Log Performed
1998-09-24 Perforation Treatment Performed - Cement Plug
1998-09-24 Perforation Treatment Performed - Remedial Casing
1998-09-25 Well Abandoned
1998-09-25 Well Fluid changed to Crude Oil
1998-09-25 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-01-02 1901.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-01-29 Perforation 2232.50 2234.00 14
1998-09-15 Acid Treatment 2183.00 2185.00 0
1998-09-23 Packing Device Capped w/Cement 2167.00 2175.00 0
1998-09-23 Perforation 375.00 375.50 13
1998-09-24 Remedial Casing Cementing 375.00 375.50 0
1998-09-24 Cement Plug 125.00 375.50 0
1994-01-29 Acid Treatment 2232.50 2234.00 0
1994-06-29 Cement Squeeze 2232.50 2234.00 0
1994-07-05 Perforation 2226.80 2227.80 13
1994-07-05 Perforation 2228.80 2230.30 13
1994-07-07 Acid Treatment 2226.80 2230.30 0
1995-08-04 Acid Treatment 2226.80 2230.30 0
1998-09-14 Packing Device Capped w/Cement 2212.00 2220.00 0
1998-09-14 Perforation 2183.00 2185.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 4447 0.0 0.0 0.0
1995 6276 0.0 0.0 0.0
1996 2651 0.0 0.0 0.0

For data sources see[6]

References