0375033201002

Well Details

Well ID: 0375033201002
Loading map...
Location: 00/01-32-037-03W5/2
Location Alias: 00/01-32-37-03 W5M
Location Alias 2: 00/01-32-037-03 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 32
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 1-32-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0164720
License Date: 1994-02-03
License Status: Suspension
Spud Date: 1994-02-03
Final Drill Date: 1994-02-14
Well Total Depth: 2298.00 m
Surface Hole Latitude: 52.218227
Surface Hole Longitude: -114.384639

For data sources see[1][2]

Well History

Date Event
1994-02-03 Obtained License
1994-02-04 Surface Casing Operation Performed
1994-02-14 Finished Drilling
1994-02-14 Well Log Performed
1994-02-14 Well Mode changed to Drilled and Cased
1994-02-16 Production Casing Operation Performed
1994-02-16 Rig Released
1994-02-23 Well Log Performed
1994-02-24 Perforation Treatment Performed - Jet Perforation
1994-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-01 Perforation Treatment Performed - Cement Squeeze
1994-03-02 Well Log Performed
1994-03-03 Perforation Treatment Performed - Jet Perforation
1994-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-14 Well Log Performed
1994-12-15 Perforation Treatment Performed - Jet Perforation
1996-02-21 Perforation Treatment Performed - Chemical Squeeze
1996-08-20 Perforation Treatment Performed - Jet Perforation
1996-08-20 Well Log Performed
1996-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-13 Plug Back Performed
2000-07-13 Well Log Performed
2000-07-14 Perforation Treatment Performed - Jet Perforation
2000-07-14 Well Log Performed
2000-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-02 Well Began Production
2000-09-02 Well Fluid changed to Gas
2000-09-02 Well Mode changed to Flowing
2007-05-01 Well Fluid changed to Gas
2007-05-01 Well Mode changed to Pumping
2014-08-01 Well Fluid changed to Gas
2014-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-24 Perforation 2249.00 2250.00 18
2000-07-13 Packing Device Capped w/Cement 2228.00 2236.00 0
2000-07-14 Perforation 2212.00 2217.00 20
2000-07-17 Acid Treatment 2212.00 2217.00 0
1994-02-25 Acid Treatment 2249.00 2250.00 0
1994-03-01 Cement Squeeze 2249.00 2250.00 0
1994-03-03 Perforation 2240.50 2246.50 18
1994-03-04 Acid Treatment 2240.50 2246.50 0
1994-12-15 Perforation 2248.50 2249.50 18
1996-02-21 Chemical Squeeze 2240.00 2249.50 0
1996-08-20 Perforation 2240.50 2246.50 18
1996-08-21 Acid Treatment 2240.50 2246.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 2146 0.0 0.0 0.0
2001 7985 0.0 0.0 0.0
2002 7676 0.0 0.0 0.0
2003 8447 0.0 0.0 0.0
2004 7775 0.0 0.0 0.0
2005 8663 0.0 0.0 0.0
2006 6870 0.0 0.0 0.0
2007 5808 0.0 0.0 0.0
2008 5208 0.0 0.0 0.0
2009 7320 0.0 0.0 0.0
2010 7152 0.0 0.0 0.0
2011 6288 0.0 0.0 0.0

For data sources see[5]