If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375033110002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.226251,"lon":-114.415296,"icon":""}]} |
Location: 00/10-31-037-03W5/2 | |
Location Alias: 00/10-31-37-03 W5M | |
Location Alias 2: 00/10-31-037-03 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 03 | |
Section: 31 | |
County/Municipality: Red Deer County | |
Well Name: CVE SYLAKE 10-31-37-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0022393 | |
License Date: 1962-05-10 | |
License Status: Abandoned | |
Spud Date: 1962-05-21 | |
Final Drill Date: 1962-06-16 | |
Well Total Depth: 2337.80 m | |
Surface Hole Latitude: 52.226251 | |
Surface Hole Longitude: -114.415296 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-05-10 | Obtained License |
1962-06-05 | Drill Stem Test Performed |
1962-06-08 | Drill Stem Test Performed |
1962-06-10 | Drill Stem Test Performed |
1962-06-11 | Drill Stem Test Performed |
1962-06-16 | Finished Drilling |
1962-06-17 | Drill Stem Test Performed |
1962-06-18 | Production Casing Operation Performed |
1962-06-19 | Perforation Treatment Performed - Jet Perforation |
1962-06-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-06-22 | Perforation Treatment Performed - Fractured |
1963-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-03-04 | Perforation Treatment Performed - Bullet Perforation |
1963-10-30 | Perforation Treatment Performed - Cement Squeeze |
1963-11-03 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1963-11-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-11-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
1964-01-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-01-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-01-18 | Perforation Treatment Performed - Jet Perforation |
1964-05-14 | Perforation Treatment Performed - Fractured |
1964-05-15 | Perforation Treatment Performed - Selective Jet Perforations |
1964-05-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-05-16 | Perforation Treatment Performed - Acid Wash - No Pressure |
1964-05-20 | Perforation Treatment Performed - Fractured |
1964-05-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-05-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1964-05-21 | Perforation Treatment Performed - Jet Perforation |
1964-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-06-03 | Perforation Treatment Performed - Fractured |
1964-06-14 | Perforation Treatment Performed - Condensate Squeeze |
1965-02-13 | Perforation Treatment Performed - Cement Squeeze |
1965-02-17 | Perforation Treatment Performed - Cement Squeeze |
1969-09-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1969-09-01 | Perforation Treatment Performed - Jet Perforation |
1969-09-01 | Well Mode changed to Drilled and Cased |
1971-02-20 | Well Began Production |
1971-02-20 | Well Fluid changed to Gas |
1971-02-20 | Well Mode changed to Flowing |
1990-06-15 | Perforation Treatment Performed - Cement Squeeze |
1990-06-20 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1990-06-20 | Perforation Treatment Performed - Jet Perforation |
1990-06-21 | Perforation Treatment Performed - Fractured |
1990-06-21 | Perforation Treatment Performed - Jet Perforation |
1990-06-25 | Perforation Treatment Performed - Fractured |
1990-07-11 | Perforation Treatment Performed - Fractured |
1990-07-19 | Perforation Treatment Performed - Fractured |
1990-07-19 | Perforation Treatment Performed - Jet Perforation |
1990-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-04-12 | Perforation Treatment Performed - Fractured |
1992-10-21 | Perforation Treatment Performed - Fractured |
1992-10-21 | Perforation Treatment Performed - Jet Perforation |
1993-05-01 | Well Fluid changed to Gas |
1993-05-01 | Well Mode changed to Suspended |
1994-07-13 | Perforation Treatment Performed - Fractured |
1994-07-13 | Perforation Treatment Performed - Jet Perforation |
1995-05-06 | Perforation Treatment Performed - Fractured |
1995-05-19 | Well Fluid changed to Gas |
1995-05-19 | Well Mode changed to Flowing |
1998-05-01 | Well Fluid changed to Gas |
1998-05-01 | Well Mode changed to Suspended |
1998-07-29 | Well Fluid changed to Gas |
1998-07-29 | Well Mode changed to Flowing |
2002-06-01 | Well Fluid changed to Gas |
2002-06-01 | Well Mode changed to Suspended |
2011-10-03 | Well Fluid changed to Gas |
2011-10-03 | Well Mode changed to Flowing |
2012-07-12 | Well Log Performed |
2012-07-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-07-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-07-16 | Plug Back Performed |
2012-07-18 | Well Log Performed |
2012-07-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-07-19 | Plug Back Performed |
2012-07-19 | Well Fluid changed to Gas |
2012-07-19 | Well Log Performed |
2012-07-19 | Well Mode changed to Abandoned Zone |
2012-07-20 | Perforation Treatment Performed - Jet Perforation |
2012-07-20 | Well Log Performed |
2012-07-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-07-23 | Perforation Treatment Performed - Jet Perforation |
2012-07-23 | Perforation Treatment Performed - Remedial Casing |
2012-07-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-07-24 | Perforation Treatment Performed - Jet Perforation |
2012-07-24 | Well Log Performed |
2012-07-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-07-25 | Perforation Treatment Performed - Remedial Casing |
2012-08-09 | Well Abandoned |
2012-08-09 | Well Fluid changed to Gas |
2012-08-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-06-19 | Perforation | 2245.00 | 2248.80 | 7 |
1963-11-04 | Acid Wash | 2257.30 | 2257.30 | 0 |
1963-11-04 | Acid Treatment | 2257.30 | 2257.30 | 0 |
1964-01-04 | Acid Treatment | 2257.30 | 2257.30 | 0 |
1964-01-18 | Perforation | 2253.70 | 2254.90 | 7 |
1964-01-18 | Acid Treatment | 2253.70 | 2257.30 | 0 |
1964-05-14 | Fracture | 2253.70 | 2257.30 | 0 |
1964-05-15 | Selective Jet Perforations | 2197.00 | 2199.40 | 0 |
1964-05-15 | Selective Jet Perforations | 2203.10 | 2203.10 | 0 |
1964-05-16 | Acid Wash | 2197.00 | 2203.10 | 0 |
1964-05-16 | Acid Treatment | 2197.00 | 2203.10 | 0 |
1962-06-19 | Perforation | 2249.40 | 2252.50 | 7 |
1964-05-20 | Fracture | 2197.00 | 2203.10 | 0 |
1964-05-21 | Perforation | 2199.70 | 2202.20 | 7 |
1964-05-21 | Acid Wash | 2197.00 | 2203.10 | 0 |
1964-05-21 | Acid Treatment | 2197.00 | 2203.10 | 0 |
1964-05-29 | Acid Treatment | 2197.00 | 2203.10 | 0 |
1964-06-03 | Fracture | 2197.00 | 2203.10 | 0 |
1964-06-14 | Condensate Squeeze | 2197.00 | 2203.10 | 0 |
1965-02-13 | Cement Squeeze | 2197.00 | 2203.10 | 0 |
1965-02-17 | Cement Squeeze | 2197.00 | 2203.10 | 0 |
1969-09-01 | Packing Device Capped w/Cement | 2133.60 | 2133.60 | 0 |
1962-06-22 | Acid Treatment | 2245.00 | 2252.50 | 0 |
1969-09-01 | Perforation | 2002.80 | 2004.70 | 7 |
1990-06-15 | Cement Squeeze | 2002.80 | 2004.70 | 0 |
1990-06-20 | Perforation | 2253.70 | 2254.90 | 7 |
1990-06-20 | Hydra Jet Perforation | 2257.30 | 2257.30 | 0 |
1990-06-21 | Perforation | 2253.00 | 2258.00 | 13 |
1990-06-21 | Perforation | 2248.20 | 2253.00 | 13 |
1990-06-21 | Fracture | 2253.00 | 2258.00 | 0 |
1990-06-25 | Fracture | 2248.00 | 2258.00 | 0 |
1990-07-11 | Fracture | 2248.00 | 2258.00 | 0 |
1990-07-19 | Perforation | 2002.50 | 2005.60 | 13 |
1962-06-22 | Fracture | 2245.00 | 2252.50 | 0 |
1990-07-19 | Fracture | 2002.50 | 2005.60 | 0 |
1990-07-23 | Acid Treatment | 2002.50 | 2005.60 | 0 |
1991-04-12 | Fracture | 2248.00 | 2258.00 | 0 |
1992-10-21 | Perforation | 2002.00 | 2014.00 | 17 |
1992-10-21 | Fracture | 2002.00 | 2014.00 | 0 |
1994-07-13 | Perforation | 2056.80 | 2061.00 | 18 |
1994-07-13 | Fracture | 2056.80 | 2061.00 | 0 |
1995-05-06 | Fracture | 2002.00 | 2014.00 | 0 |
2012-07-13 | Packing Device Capped w/Cement | 2212.00 | 2220.00 | 0 |
2012-07-16 | Packing Device Capped w/Cement | 2179.00 | 2187.00 | 0 |
1963-03-04 | Bullet Perforation | 2254.60 | 2255.80 | 7 |
2012-07-19 | Packing Device Capped w/Cement | 2034.00 | 2042.00 | 0 |
2012-07-19 | Packing Device Capped w/Cement | 1984.00 | 1992.00 | 0 |
2012-07-20 | Perforation | 870.00 | 871.00 | 17 |
2012-07-23 | Remedial Casing Cementing | 870.00 | 871.00 | 0 |
2012-07-23 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
2012-07-23 | Perforation | 575.00 | 576.00 | 17 |
2012-07-23 | Remedial Casing Cementing | 575.00 | 576.00 | 0 |
2012-07-24 | Packing Device Capped w/Cement | 561.00 | 569.00 | 0 |
2012-07-24 | Perforation | 451.00 | 452.00 | 17 |
2012-07-25 | Remedial Casing Cementing | 451.00 | 452.00 | 0 |
1963-03-04 | Bullet Perforation | 2256.40 | 2257.70 | 7 |
2012-07-25 | Packing Device Capped w/Cement | 430.00 | 442.00 | 0 |
1963-03-04 | Acid Treatment | 2245.20 | 2257.70 | 0 |
1963-10-30 | Cement Squeeze | 2245.20 | 2257.70 | 0 |
1963-11-03 | Hydra Jet Perforation | 2257.30 | 2257.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1971 | 7383 | 0.0 | 0.0 | 0.0 |
1972 | 7543 | 0.0 | 0.0 | 0.0 |
1973 | 7383 | 0.0 | 0.0 | 0.0 |
1974 | 4203 | 0.0 | 0.0 | 0.0 |
1976 | 33 | 0.0 | 0.0 | 0.0 |
1978 | 1619 | 0.0 | 0.0 | 0.0 |
1979 | 5829 | 0.0 | 0.0 | 0.0 |
1980 | 4156 | 0.0 | 0.0 | 0.0 |
1981 | 4419 | 0.0 | 0.0 | 0.0 |
1982 | 3758 | 0.0 | 0.0 | 0.0 |
1983 | 2371 | 0.0 | 0.0 | 0.0 |
1984 | 2832 | 0.0 | 0.0 | 0.0 |
1985 | 3230 | 0.0 | 0.0 | 0.0 |
1986 | 3239 | 0.0 | 0.0 | 0.0 |
1987 | 2128 | 0.0 | 0.0 | 0.0 |
1988 | 2572 | 0.0 | 0.0 | 0.0 |
1989 | 2657 | 0.0 | 0.0 | 0.0 |
1990 | 2197 | 0.0 | 0.0 | 0.0 |
1991 | 25 | 0.0 | 0.0 | 0.0 |
1995 | 3552 | 0.0 | 0.0 | 0.0 |
1996 | 8471 | 0.0 | 0.0 | 0.0 |
1997 | 6222 | 0.0 | 0.0 | 0.0 |
1998 | 5952 | 0.0 | 0.0 | 0.0 |
1999 | 1656 | 0.0 | 0.0 | 0.0 |
2000 | 1093 | 0.0 | 0.0 | 0.0 |
2011 | 2136 | 0.0 | 0.0 | 0.0 |
2012 | 240 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-09 | No Incident Encountered | 0.00 | 0.00 |
2012-08-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]