If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375032104004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.191496,"lon":-114.376668,"icon":""}]} |
Location: 00/04-21-037-03W5/4 | |
Location Alias: 00/04-21-37-03 W5M | |
Location Alias 2: 00/04-21-037-03 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 03 | |
Section: 21 | |
County/Municipality: Red Deer County | |
Well Name: CVE SYLAKE 4-21-37-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0093048 | |
License Date: 1981-10-30 | |
License Status: Issued | |
Spud Date: 1981-11-05 | |
Final Drill Date: 1981-11-27 | |
Well Total Depth: 2916.00 m | |
Surface Hole Latitude: 52.191496 | |
Surface Hole Longitude: -114.376668 |
Date | Event |
---|---|
1981-10-30 | Obtained License |
1981-11-27 | Finished Drilling |
1981-11-27 | Well Log Performed |
1981-11-29 | Drill Stem Test Performed |
1981-11-30 | Drill Stem Test Performed |
1981-12-03 | Production Casing Operation Performed |
1982-01-21 | Perforation Treatment Performed - Open-Hole Completion |
1982-01-21 | Well Log Performed |
1982-01-22 | Well Log Performed |
1982-01-26 | Well Log Performed |
1982-01-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-01-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-01-28 | Perforation Treatment Performed - Jet Perforation |
1982-05-28 | Perforation Treatment Performed - Jet Perforation |
1982-06-01 | Perforation Treatment Performed - Cement Squeeze |
1982-06-09 | Perforation Treatment Performed - Jet Perforation |
1982-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-10-14 | Perforation Treatment Performed - Cement Squeeze |
1983-10-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-10-15 | Perforation Treatment Performed - Jet Perforation |
1984-05-17 | Perforation Treatment Performed - Cement Squeeze |
1984-05-18 | Perforation Treatment Performed - Jet Perforation |
1984-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-06-08 | Perforation Treatment Performed - Cement Squeeze |
1984-06-11 | Well Log Performed |
1984-06-12 | Perforation Treatment Performed - Jet Perforation |
1984-06-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-10-31 | Perforation Treatment Performed - Cement Squeeze |
1984-11-02 | Well Log Performed |
1984-11-03 | Perforation Treatment Performed - Jet Perforation |
1987-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-10-27 | Perforation Treatment Performed - Cement Squeeze |
1987-10-27 | Plug Back Performed |
1987-10-31 | Perforation Treatment Performed - Jet Perforation |
1987-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-11-05 | Perforation Treatment Performed - Cement Squeeze |
1987-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-11-07 | Perforation Treatment Performed - Jet Perforation |
1987-11-10 | Well Log Performed |
1987-11-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-11-11 | Plug Back Performed |
1987-11-12 | Perforation Treatment Performed - Jet Perforation |
1987-11-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-11-14 | Perforation Treatment Performed - Jet Perforation |
1987-11-17 | Perforation Treatment Performed - Cement Squeeze |
1987-11-18 | Well Log Performed |
1987-11-19 | Perforation Treatment Performed - Jet Perforation |
1987-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-11-21 | Perforation Treatment Performed - Cement Squeeze |
1987-11-21 | Plug Back Performed |
1989-10-05 | Well Log Performed |
1990-03-20 | Well Log Performed |
1990-04-09 | Well Log Performed |
1990-04-10 | Perforation Treatment Performed - Jet Perforation |
1990-04-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-01-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-01-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-04-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-04-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-10-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-02-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-07-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-08-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-09-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-10-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-02-09 | Perforation Treatment Performed - Jet Perforation |
1994-02-09 | Well Log Performed |
1994-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-04-15 | Perforation Treatment Performed - Jet Perforation |
1995-05-26 | Well Log Performed |
1995-05-27 | Perforation Treatment Performed - Jet Perforation |
1995-10-10 | Well Log Performed |
1995-10-11 | Perforation Treatment Performed - Jet Perforation |
1995-10-11 | Well Mode changed to Drilled and Cased |
1995-11-02 | Well Began Production |
1995-11-02 | Well Fluid changed to Gas |
1995-11-02 | Well Mode changed to Flowing |
2009-12-02 | Perforation Treatment Performed - Cement Squeeze |
2009-12-02 | Plug Back Performed |
2009-12-17 | Perforation Treatment Performed - Cement Plug |
2009-12-17 | Plug Back Performed |
2009-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-12-18 | Plug Back Performed |
2009-12-19 | Perforation Treatment Performed - Jet Perforation |
2009-12-20 | Perforation Treatment Performed - Fractured |
2015-03-01 | Well Fluid changed to Gas |
2015-03-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-01-21 | Open Hole/Barefoot Completion | 2885.00 | 2916.00 | 0 |
1983-10-15 | Perforation | 2866.00 | 2867.50 | 13 |
1983-10-15 | Acid Treatment | 2866.00 | 2867.50 | 0 |
1984-05-17 | Cement Squeeze | 2866.00 | 2867.50 | 0 |
1984-05-18 | Perforation | 2235.00 | 2237.00 | 13 |
1984-05-18 | Perforation | 2238.00 | 2240.00 | 13 |
1984-05-18 | Perforation | 2241.00 | 2242.00 | 13 |
1984-05-19 | Acid Treatment | 2235.00 | 2242.00 | 0 |
1984-06-08 | Cement Squeeze | 2235.00 | 2242.00 | 0 |
1984-06-12 | Perforation | 2238.00 | 2240.00 | 13 |
1984-06-12 | Perforation | 2241.00 | 2242.00 | 13 |
1982-01-28 | Packing Device Capped w/Cement | 2879.50 | 2883.00 | 0 |
1984-06-15 | Acid Treatment | 2238.00 | 2242.00 | 0 |
1984-10-31 | Cement Squeeze | 2238.00 | 2242.00 | 0 |
1984-11-03 | Perforation | 2238.00 | 2240.00 | 13 |
1987-10-27 | Acid Treatment | 2238.00 | 2240.00 | 0 |
1987-10-27 | Cement Squeeze | 2238.00 | 2240.00 | 0 |
1987-10-31 | Perforation | 2862.50 | 2863.50 | 13 |
1987-11-01 | Acid Treatment | 2862.50 | 2863.50 | 0 |
1987-11-05 | Cement Squeeze | 2862.50 | 2863.50 | 0 |
1987-11-07 | Perforation | 2859.50 | 2861.50 | 13 |
1987-11-07 | Acid Treatment | 2859.50 | 2861.50 | 0 |
1982-01-28 | Perforation | 2872.50 | 2875.00 | 13 |
1987-11-11 | Packing Device Capped w/Cement | 2855.00 | 2855.00 | 0 |
1987-11-12 | Perforation | 2266.00 | 2268.00 | 13 |
1987-11-13 | Acid Treatment | 2266.00 | 2268.00 | 0 |
1987-11-14 | Perforation | 2281.00 | 2282.00 | 13 |
1987-11-17 | Cement Squeeze | 2266.00 | 2282.00 | 0 |
1987-11-19 | Perforation | 2266.00 | 2268.00 | 13 |
1987-11-20 | Acid Treatment | 2266.00 | 2268.00 | 0 |
1987-11-21 | Cement Squeeze | 2266.00 | 2268.00 | 0 |
1990-04-10 | Perforation | 2266.00 | 2268.00 | 13 |
1990-04-10 | Perforation | 2281.00 | 2285.00 | 13 |
1982-01-28 | Acid Treatment | 2872.50 | 2875.00 | 0 |
1990-04-10 | Perforation | 2291.00 | 2297.00 | 13 |
1990-04-12 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1991-01-17 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1991-02-24 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1991-07-24 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1991-10-29 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1991-12-21 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1992-01-23 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1992-02-06 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1992-04-10 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1982-05-28 | Perforation | 2877.40 | 2878.10 | 13 |
1992-04-11 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1992-05-19 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1992-10-14 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1993-02-03 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1993-03-19 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1993-03-30 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1993-05-19 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1993-06-10 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1993-07-19 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1993-08-16 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1982-06-01 | Cement Squeeze | 2872.50 | 2878.10 | 0 |
1993-09-09 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1993-09-27 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1993-10-14 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1994-02-09 | Perforation | 2268.00 | 2280.00 | 13 |
1994-02-09 | Perforation | 2285.00 | 2291.00 | 13 |
1994-02-09 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1994-03-04 | Acid Treatment | 2266.00 | 2297.00 | 0 |
1994-04-15 | Perforation | 2268.00 | 2280.00 | 13 |
1994-04-15 | Perforation | 2285.00 | 2291.00 | 13 |
1995-05-27 | Perforation | 2228.00 | 2239.00 | 13 |
1982-06-09 | Perforation | 2872.50 | 2874.00 | 13 |
1995-10-11 | Perforation | 505.00 | 516.00 | 18 |
2009-12-02 | Cement Squeeze | 505.00 | 516.00 | 0 |
2009-12-17 | Cement Plug | 1877.00 | 2317.00 | 0 |
2009-12-18 | Packing Device Capped w/Cement | 1862.00 | 1870.00 | 0 |
2009-12-19 | Perforation | 1717.00 | 1720.50 | 17 |
2009-12-19 | Perforation | 1720.50 | 1724.00 | 17 |
2009-12-20 | Fracture | 1717.00 | 1724.00 | 0 |
1982-06-10 | Acid Treatment | 2872.50 | 2874.00 | 0 |
1983-10-14 | Cement Squeeze | 2872.50 | 2874.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 1344 | 0.0 | 0.0 | 0.0 |
1996 | 7592 | 0.0 | 0.0 | 0.0 |
1997 | 7348 | 0.0 | 0.0 | 0.0 |
1998 | 7661 | 0.0 | 0.0 | 0.0 |
1999 | 8060 | 0.0 | 0.0 | 0.0 |
2000 | 8237 | 0.0 | 0.0 | 0.0 |
2001 | 7794 | 0.0 | 0.0 | 0.0 |
2002 | 8625 | 0.0 | 0.0 | 0.0 |
2003 | 8172 | 0.0 | 0.0 | 0.0 |
2004 | 8693 | 0.0 | 0.0 | 0.0 |
2005 | 8057 | 0.0 | 0.0 | 0.0 |
2006 | 3214 | 0.0 | 0.0 | 0.0 |
2007 | 8663 | 0.0 | 0.0 | 0.0 |
2008 | 7806 | 0.0 | 0.0 | 0.0 |
2009 | 7134 | 0.0 | 0.0 | 0.0 |
2010 | 1 | 0.0 | 0.0 | 0.0 |
2013 | 14 | 0.0 | 0.0 | 0.0 |
For data sources see[5]