X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375031905000

Well Details

Well ID: 0375031905000
Loading map...
Location: 00/05-19-037-03W5/0
Location Alias: 00/05-19-37-03 W5M
Location Alias 2: 00/05-19-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 19
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 5-19-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0150810
License Date: 1991-12-02
License Status: Abandoned
Spud Date: 1991-12-12
Final Drill Date: 1991-12-29
Well Total Depth: 2405.00 m
Surface Hole Latitude: 52.192855
Surface Hole Longitude: -114.425190

For data sources see[1][2]

Well History

Date Event
1991-01-08 Well Log Performed
1991-12-02 Obtained License
1991-12-13 Surface Casing Operation Performed
1991-12-19 Drill Stem Test Performed
1991-12-29 Finished Drilling
1991-12-29 Well Mode changed to Drilled and Cased
1991-12-31 Well Log Performed
1992-01-01 Drill Stem Test Performed
1992-01-02 Drill Stem Test Performed
1992-01-04 Production Casing Operation Performed
1992-01-04 Rig Released
1992-01-16 Perforation Treatment Performed - Jet Perforation
1992-01-16 Well Log Performed
1992-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-21 Perforation Treatment Performed - Jet Perforation
1992-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-22 Well Began Production
1992-01-22 Well Fluid changed to Crude Oil
1992-01-22 Well Mode changed to Flowing
1992-04-28 Well Log Performed
1992-05-12 Perforation Treatment Performed - Cement Squeeze
1993-06-03 Perforation Treatment Performed - Cement Squeeze
1993-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-08 Perforation Treatment Performed - Jet Perforation
1993-09-21 Well Fluid changed to Crude Oil
1993-09-21 Well Mode changed to Pumping
1993-10-13 Perforation Treatment Performed - Cement Squeeze
1993-10-15 Perforation Treatment Performed - Acid Wash - No Pressure
1993-10-15 Perforation Treatment Performed - Jet Perforation
1995-05-17 Perforation Treatment Performed - Jet Perforation
1995-05-17 Well Log Performed
1995-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-19 Perforation Treatment Performed - Jet Perforation
1998-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-01 Well Fluid changed to Crude Oil
2002-06-01 Well Mode changed to Suspended
2012-08-28 Well Log Performed
2012-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-30 Plug Back Performed
2012-08-30 Well Fluid changed to Crude Oil
2012-08-30 Well Log Performed
2012-08-30 Well Mode changed to Abandoned Zone
2012-09-04 Perforation Treatment Performed - Jet Perforation
2012-09-04 Well Log Performed
2012-09-05 Perforation Treatment Performed - Remedial Casing
2012-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-06 Perforation Treatment Performed - Jet Perforation
2012-09-06 Well Log Performed
2012-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-07 Perforation Treatment Performed - Jet Perforation
2012-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-09-10 Perforation Treatment Performed - Remedial Casing
2012-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-28 Well Abandoned
2012-09-28 Well Fluid changed to Crude Oil
2012-09-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-01-16 Perforation 2293.00 2295.00 20
1993-10-15 Perforation 2283.50 2287.00 18
1993-10-15 Acid Wash 2283.50 2287.00 0
1995-05-17 Perforation 2278.00 2279.50 17
1995-05-17 Perforation 2281.50 2282.50 17
1995-05-18 Acid Treatment 2278.00 2282.50 0
1998-12-19 Perforation 2274.00 2277.00 18
1998-12-20 Acid Treatment 2274.00 2277.00 0
2012-08-30 Packing Device Capped w/Cement 2254.00 2262.00 0
2012-09-04 Perforation 595.00 596.00 13
2012-09-05 Remedial Casing Cementing 595.00 596.00 0
1992-01-17 Acid Treatment 2293.00 2295.00 0
2012-09-06 Packing Device Capped w/Cement 578.00 586.00 0
2012-09-06 Perforation 408.00 409.00 13
2012-09-06 Packing Device Capped w/Cement 392.00 400.00 0
2012-09-06 Perforation 369.00 370.00 13
2012-09-07 Packing Device Capped w/Cement 358.00 366.00 0
2012-09-07 Perforation 344.00 345.00 13
2012-09-07 Packing Device Capped w/Cement 331.00 339.00 0
2012-09-07 Perforation 293.00 294.00 13
2012-09-10 Acid Treatment 293.00 294.00 0
2012-09-10 Remedial Casing Cementing 293.00 294.00 0
1992-01-21 Perforation 2284.00 2289.50 20
2012-09-11 Packing Device Capped w/Cement 269.00 287.00 0
1992-01-22 Acid Treatment 2284.00 2289.50 0
1992-05-12 Cement Squeeze 2293.00 2295.00 0
1993-06-03 Cement Squeeze 2284.00 2289.50 0
1993-06-08 Perforation 2286.50 2288.00 18
1993-06-08 Acid Treatment 2286.50 2288.00 0
1993-10-13 Cement Squeeze 2286.50 2288.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 7892 0.0 0.0 0.0
1993 8013 0.0 0.0 0.0
1994 8519 0.0 0.0 0.0
1995 8261 0.0 0.0 0.0
1996 8112 0.0 0.0 0.0
1997 8296 0.0 0.0 0.0
1998 2840 0.0 0.0 0.0
1999 8532 0.0 0.0 0.0
2000 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-12-22 No Incident Encountered 0.00 0.00
2012-09-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References