If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375031810000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.182679,"lon":-114.415615,"icon":""}]} |
Location: 00/10-18-037-03W5/0 | |
Location Alias: 00/10-18-37-03 W5M | |
Location Alias 2: 00/10-18-037-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 03 | |
Section: 18 | |
County/Municipality: Red Deer County | |
Well Name: AMOCO SYLVAN LAKE 10-18-37-3 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0023167 | |
License Date: 1962-10-16 | |
License Status: RecCertified | |
Spud Date: 1962-10-23 | |
Final Drill Date: 1962-12-01 | |
Well Total Depth: 2910.80 m | |
Surface Hole Latitude: 52.182679 | |
Surface Hole Longitude: -114.415615 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-10-16 | Obtained License |
1962-11-09 | Drill Stem Test Performed |
1962-11-10 | Drill Stem Test Performed |
1962-11-11 | Drill Stem Test Performed |
1962-12-01 | Finished Drilling |
1962-12-01 | Well Mode changed to Drilled and Cased |
1962-12-03 | Production Casing Operation Performed |
1962-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-12-04 | Perforation Treatment Performed - Jet Perforation |
1962-12-09 | Perforation Treatment Performed - Cement Squeeze |
1962-12-09 | Perforation Treatment Performed - Jet Perforation |
1962-12-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-12-21 | Perforation Treatment Performed - Cement Squeeze |
1962-12-21 | Perforation Treatment Performed - Jet Perforation |
1962-12-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-12-31 | Perforation Treatment Performed - Fractured |
1963-01-27 | Well Began Production |
1963-01-27 | Well Fluid changed to Crude Oil |
1963-01-27 | Well Mode changed to Flowing |
1975-04-29 | Well Fluid changed to Crude Oil |
1975-04-29 | Well Mode changed to Suspended |
1986-03-01 | Well Fluid changed to Crude Oil |
1986-03-01 | Well Mode changed to Flowing |
1987-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-02-06 | Plug Back Performed |
1987-02-06 | Well Log Performed |
1987-02-07 | Perforation Treatment Performed - Jet Perforation |
1987-02-07 | Well Log Performed |
1987-02-09 | Perforation Treatment Performed - Cement Squeeze |
1987-02-11 | Perforation Treatment Performed - Cement Plug |
1987-02-11 | Plug Back Performed |
1987-02-13 | Well Log Performed |
1987-02-16 | Well Abandoned |
1987-02-16 | Well Fluid changed to Crude Oil |
1987-02-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-12-04 | Perforation | 2302.80 | 2304.60 | 7 |
1962-12-31 | Fracture | 2287.80 | 2290.30 | 0 |
1987-02-06 | Packing Device Capped w/Cement | 2247.00 | 2255.00 | 0 |
1987-02-07 | Perforation | 427.00 | 428.00 | 13 |
1987-02-09 | Cement Squeeze | 427.00 | 428.00 | 0 |
1987-02-11 | Cement Plug | 394.00 | 398.00 | 0 |
1962-12-04 | Perforation | 2297.90 | 2299.70 | 7 |
1962-12-04 | Acid Treatment | 2297.90 | 2304.60 | 0 |
1962-12-09 | Cement Squeeze | 2297.90 | 2304.60 | 0 |
1962-12-09 | Perforation | 2297.00 | 2299.40 | 13 |
1962-12-14 | Acid Treatment | 2297.00 | 2299.40 | 0 |
1962-12-21 | Cement Squeeze | 2297.00 | 2299.40 | 0 |
1962-12-21 | Perforation | 2287.80 | 2290.30 | 13 |
1962-12-24 | Acid Treatment | 2287.80 | 2290.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 24 | 0.0 | 0.0 | 0.0 |
1969 | 571 | 0.0 | 0.0 | 0.0 |
1970 | 1680 | 0.0 | 0.0 | 0.0 |
1971 | 2586 | 0.0 | 0.0 | 0.0 |
1972 | 3183 | 0.0 | 0.0 | 0.0 |
1973 | 2372 | 0.0 | 0.0 | 0.0 |
1974 | 696 | 0.0 | 0.0 | 0.0 |
1986 | 4012 | 0.0 | 0.0 | 0.0 |
1987 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]