X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375031810000

Well Details

Well ID: 0375031810000
Loading map...
Location: 00/10-18-037-03W5/0
Location Alias: 00/10-18-37-03 W5M
Location Alias 2: 00/10-18-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 18
County/Municipality: Red Deer County
Well Name: AMOCO SYLVAN LAKE 10-18-37-3
Operator Name: BP Canada Energy Group ULC
License Number: 0023167
License Date: 1962-10-16
License Status: RecCertified
Spud Date: 1962-10-23
Final Drill Date: 1962-12-01
Well Total Depth: 2910.80 m
Surface Hole Latitude: 52.182679
Surface Hole Longitude: -114.415615

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-10-16 Obtained License
1962-11-09 Drill Stem Test Performed
1962-11-10 Drill Stem Test Performed
1962-11-11 Drill Stem Test Performed
1962-12-01 Finished Drilling
1962-12-01 Well Mode changed to Drilled and Cased
1962-12-03 Production Casing Operation Performed
1962-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-04 Perforation Treatment Performed - Jet Perforation
1962-12-09 Perforation Treatment Performed - Cement Squeeze
1962-12-09 Perforation Treatment Performed - Jet Perforation
1962-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-21 Perforation Treatment Performed - Cement Squeeze
1962-12-21 Perforation Treatment Performed - Jet Perforation
1962-12-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-31 Perforation Treatment Performed - Fractured
1963-01-27 Well Began Production
1963-01-27 Well Fluid changed to Crude Oil
1963-01-27 Well Mode changed to Flowing
1975-04-29 Well Fluid changed to Crude Oil
1975-04-29 Well Mode changed to Suspended
1986-03-01 Well Fluid changed to Crude Oil
1986-03-01 Well Mode changed to Flowing
1987-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-02-06 Plug Back Performed
1987-02-06 Well Log Performed
1987-02-07 Perforation Treatment Performed - Jet Perforation
1987-02-07 Well Log Performed
1987-02-09 Perforation Treatment Performed - Cement Squeeze
1987-02-11 Perforation Treatment Performed - Cement Plug
1987-02-11 Plug Back Performed
1987-02-13 Well Log Performed
1987-02-16 Well Abandoned
1987-02-16 Well Fluid changed to Crude Oil
1987-02-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-12-04 Perforation 2302.80 2304.60 7
1962-12-31 Fracture 2287.80 2290.30 0
1987-02-06 Packing Device Capped w/Cement 2247.00 2255.00 0
1987-02-07 Perforation 427.00 428.00 13
1987-02-09 Cement Squeeze 427.00 428.00 0
1987-02-11 Cement Plug 394.00 398.00 0
1962-12-04 Perforation 2297.90 2299.70 7
1962-12-04 Acid Treatment 2297.90 2304.60 0
1962-12-09 Cement Squeeze 2297.90 2304.60 0
1962-12-09 Perforation 2297.00 2299.40 13
1962-12-14 Acid Treatment 2297.00 2299.40 0
1962-12-21 Cement Squeeze 2297.00 2299.40 0
1962-12-21 Perforation 2287.80 2290.30 13
1962-12-24 Acid Treatment 2287.80 2290.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 24 0.0 0.0 0.0
1969 571 0.0 0.0 0.0
1970 1680 0.0 0.0 0.0
1971 2586 0.0 0.0 0.0
1972 3183 0.0 0.0 0.0
1973 2372 0.0 0.0 0.0
1974 696 0.0 0.0 0.0
1986 4012 0.0 0.0 0.0
1987 24 0.0 0.0 0.0

For data sources see[5]

References