X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375031702000

Well Details

Well ID: 0375031702000
Loading map...
Location: 00/02-17-037-03W5/0
Location Alias: 00/02-17-37-03 W5M
Location Alias 2: 00/02-17-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 17
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 2-17-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0174822
License Date: 1995-01-11
License Status: Suspension
Spud Date: 1995-01-17
Final Drill Date: 1995-01-26
Well Total Depth: 2353.50 m
Surface Hole Latitude: 52.176762
Surface Hole Longitude: -114.392475

For data sources see[1][2]

Well History

Date Event
1994-02-21 Well Log Performed
1995-01-11 Obtained License
1995-01-17 Surface Casing Operation Performed
1995-01-21 Direction Drilling Operation Performed - Deviate
1995-01-26 Finished Drilling
1995-01-26 Well Mode changed to Drilled and Cased
1995-01-27 Well Log Performed
1995-01-29 Drill Stem Test Performed
1995-01-30 Drill Stem Test Performed
1995-02-01 Production Casing Operation Performed
1995-02-02 Rig Released
1995-02-22 Perforation Treatment Performed - Jet Perforation
1995-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-23 Well Log Performed
1995-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-25 Perforation Treatment Performed - Jet Perforation
1995-03-06 Well Log Performed
1995-05-26 Well Began Production
1995-05-26 Well Fluid changed to Gas
1995-05-26 Well Mode changed to Flowing
1996-05-22 Well Log Performed
1996-05-23 Perforation Treatment Performed - Cement Squeeze
1996-05-23 Plug Back Performed
1996-05-26 Perforation Treatment Performed - Cement Squeeze
1996-05-26 Plug Back Performed
1996-05-27 Well Log Performed
1996-05-28 Perforation Treatment Performed - Jet Perforation
1996-06-17 Well Fluid changed to Gas
1996-06-17 Well Mode changed to Suspended
1996-06-20 Perforation Treatment Performed - Cement Squeeze
1996-06-20 Plug Back Performed
1996-06-23 Perforation Treatment Performed - Cement Squeeze
1996-06-23 Perforation Treatment Performed - Open-Hole Completion
1996-06-25 Well Log Performed
1996-06-28 Liner Casing Operation Performed
1996-07-04 Perforation Treatment Performed - Jet Perforation
1996-07-04 Well Log Performed
1996-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-13 Well Fluid changed to Crude Oil
1996-07-13 Well Mode changed to Pumping
1996-10-27 Perforation Treatment Performed - Cement Squeeze
1996-10-29 Perforation Treatment Performed - Jet Perforation
1996-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-30 Well Fluid changed to Crude Oil
1997-06-30 Well Mode changed to Suspended
2007-10-05 Well Log Performed
2007-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-09 Plug Back Performed
2007-10-09 Well Fluid changed to Crude Oil
2007-10-09 Well Mode changed to Abandoned Zone
2007-10-12 Perforation Treatment Performed - Jet Perforation
2007-10-13 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-01-21 1810.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-22 Perforation 2314.00 2320.00 17
1996-05-28 Perforation 2307.00 2312.50 17
1996-06-20 Cement Squeeze 2302.00 2320.00 0
1996-06-23 Open Hole/Barefoot Completion 2327.00 2353.50 0
1996-06-23 Cement Squeeze 2327.00 2353.50 0
1996-07-04 Perforation 2337.00 2347.00 13
1996-07-06 Acid Treatment 2337.00 2347.00 0
1996-10-27 Cement Squeeze 2337.00 2347.00 0
1996-10-29 Perforation 2343.00 2347.00 20
1996-10-30 Acid Treatment 2343.00 2347.00 0
2007-10-09 Packing Device Capped w/Cement 2197.00 2331.00 0
1995-02-23 Acid Treatment 2314.00 2320.00 0
2007-10-12 Perforation 2021.00 2023.50 17
2007-10-13 Fracture 2021.00 2023.50 0
1995-02-25 Perforation 2264.00 2270.00 17
1995-02-25 Perforation 2274.00 2276.00 17
1995-02-25 Perforation 2289.10 2291.00 17
1995-02-25 Acid Treatment 2264.00 2291.00 0
1996-05-23 Cement Squeeze 2264.00 2270.00 0
1996-05-26 Cement Squeeze 2274.00 2291.00 0
1996-05-28 Perforation 2302.00 2305.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 5315 0.0 0.0 0.0
1996 6332 0.0 0.0 0.0
1997 2984 0.0 0.0 0.0

For data sources see[6]

References