If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375031115002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.170296,"lon":-114.322338,"icon":""}]} |
Location: 00/15-11-037-03W5/2 | |
Location Alias: 00/15-11-37-03 W5M | |
Location Alias 2: 00/15-11-037-03 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 03 | |
Section: 11 | |
County/Municipality: Red Deer County | |
Well Name: CVE SYLAKE 15-11-37-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0152701 | |
License Date: 1992-06-08 | |
License Status: RecCertified | |
Spud Date: 1992-06-25 | |
Final Drill Date: 1992-07-06 | |
Well Total Depth: 2310.00 m | |
Surface Hole Latitude: 52.170296 | |
Surface Hole Longitude: -114.322338 |
Date | Event |
---|---|
1992-06-08 | Obtained License |
1992-06-27 | Surface Casing Operation Performed |
1992-07-06 | Finished Drilling |
1992-07-06 | Well Log Performed |
1992-07-06 | Well Mode changed to Drilled and Cased |
1992-07-07 | Drill Stem Test Performed |
1992-07-11 | Production Casing Operation Performed |
1992-07-12 | Rig Released |
1992-07-25 | Well Log Performed |
1992-07-28 | Perforation Treatment Performed - Jet Perforation |
1992-07-28 | Well Log Performed |
1992-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-11-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-11-16 | Perforation Treatment Performed - Jet Perforation |
1992-11-16 | Plug Back Performed |
1992-11-16 | Well Log Performed |
1992-11-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-01-02 | Well Began Production |
1993-01-02 | Well Fluid changed to Crude Oil |
1993-01-02 | Well Mode changed to Flowing |
1993-10-07 | Well Log Performed |
1993-10-09 | Perforation Treatment Performed - Cement Squeeze |
1993-10-09 | Well Log Performed |
1993-10-14 | Perforation Treatment Performed - Jet Perforation |
1993-10-14 | Well Log Performed |
1993-10-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-10-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-12-05 | Well Fluid changed to Crude Oil |
1994-12-05 | Well Mode changed to Pumping |
1995-10-17 | Perforation Treatment Performed - Jet Perforation |
1995-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-10-18 | Well Log Performed |
1997-03-03 | Perforation Treatment Performed - Cement Squeeze |
1997-03-07 | Perforation Treatment Performed - Jet Perforation |
1997-03-08 | Perforation Treatment Performed - Jet Perforation |
1997-03-08 | Well Log Performed |
1997-03-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-01-22 | Well Log Performed |
1998-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-01-24 | Plug Back Performed |
1998-01-24 | Well Fluid changed to Crude Oil |
1998-01-24 | Well Log Performed |
1998-01-24 | Well Mode changed to Abandoned Zone |
1998-02-03 | Well Abandoned |
1998-02-03 | Well Fluid changed to Crude Oil |
1998-02-03 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-07-28 | Perforation | 2248.00 | 2251.00 | 13 |
1993-10-19 | Acid Treatment | 2205.20 | 2209.00 | 0 |
1995-10-17 | Perforation | 2191.00 | 2198.00 | 17 |
1995-10-17 | Perforation | 2201.00 | 2202.00 | 17 |
1995-10-17 | Perforation | 2202.40 | 2203.50 | 17 |
1995-10-17 | Perforation | 2205.00 | 2209.00 | 17 |
1995-10-17 | Perforation | 2213.00 | 2214.00 | 17 |
1995-10-17 | Perforation | 2214.50 | 2215.50 | 17 |
1995-10-17 | Perforation | 2218.50 | 2219.50 | 17 |
1995-10-18 | Acid Treatment | 2191.00 | 2219.50 | 0 |
1997-03-03 | Cement Squeeze | 2191.00 | 2219.50 | 0 |
1992-07-29 | Acid Treatment | 2248.00 | 2251.00 | 0 |
1997-03-07 | Perforation | 2248.00 | 2251.00 | 13 |
1997-03-08 | Perforation | 2248.00 | 2254.00 | 17 |
1997-03-10 | Acid Treatment | 2248.00 | 2254.00 | 0 |
1998-01-24 | Packing Device Capped w/Cement | 2235.00 | 2243.00 | 0 |
1998-01-24 | Packing Device Capped w/Cement | 2172.00 | 2180.00 | 0 |
1992-11-16 | Packing Device Capped w/Cement | 2237.00 | 2245.00 | 0 |
1992-11-16 | Perforation | 2202.70 | 2203.70 | 13 |
1992-11-16 | Perforation | 2205.20 | 2209.00 | 13 |
1992-11-19 | Acid Treatment | 2202.70 | 2209.00 | 0 |
1993-10-09 | Cement Squeeze | 2202.70 | 2209.00 | 0 |
1993-10-14 | Perforation | 2205.20 | 2209.00 | 10 |
1993-10-15 | Acid Treatment | 2205.20 | 2209.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 5126 | 0.0 | 0.0 | 0.0 |
1994 | 7188 | 0.0 | 0.0 | 0.0 |
1995 | 4652 | 0.0 | 0.0 | 0.0 |
1996 | 4478 | 0.0 | 0.0 | 0.0 |
1997 | 4842 | 0.0 | 0.0 | 0.0 |
For data sources see[5]