X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375030916030

Well Details

Well ID: 0375030916030
Loading map...
Location: 03/16-09-037-03W5/0
Location Alias: 03/16-09-37-03 W5M
Location Alias 2: 03/16-09-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 09
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 16-9-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0436123
License Date: 2011-08-17
License Status: Issued
Spud Date: 2011-09-24
Final Drill Date: 2011-10-02
Well Total Depth: 3115.00 m
Surface Hole Latitude: 52.159684
Surface Hole Longitude: -114.364602

For data sources see[1][2]

Well History

Date Event
2011-08-17 Obtained License
2011-09-25 Surface Casing Operation Performed
2011-09-28 Direction Drilling Operation Performed - Horizontal
2011-10-02 Finished Drilling
2011-10-02 Well Log Performed
2011-10-02 Well Mode changed to Drilled and Cased
2011-10-04 Liner Casing Operation Performed
2011-10-04 Perforation Treatment Performed - Open-Hole Completion
2011-10-04 Production Casing Operation Performed
2011-10-04 Rig Released
2011-11-04 Well Log Performed
2011-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-15 Well Fluid changed to Crude Oil
2011-11-15 Well Mode changed to Drilling and Completing
2012-03-03 Well Began Production
2012-03-03 Well Fluid changed to Crude Oil
2012-03-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-28 1386.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-04 Open Hole/Barefoot Completion 3094.00 3115.00 0
2011-11-12 Multi-Stage Fracture 2362.90 2363.70 0
2011-11-12 Multi-Stage Fracture 2271.10 2271.90 0
2011-11-12 Multi-Stage Fracture 2179.00 2179.80 0
2011-11-12 Multi-Stage Fracture 2075.20 2076.00 0
2011-11-12 Multi-Stage Fracture 1998.50 1999.30 0
2011-11-12 Multi-Stage Fracture 3084.70 3085.50 0
2011-11-12 Multi-Stage Fracture 3020.60 3021.40 0
2011-11-12 Multi-Stage Fracture 2916.00 2916.80 0
2011-11-12 Multi-Stage Fracture 2841.60 2842.40 0
2011-11-12 Multi-Stage Fracture 2737.40 2738.20 0
2011-11-12 Multi-Stage Fracture 2646.00 2646.80 0
2011-11-12 Multi-Stage Fracture 2541.30 2542.10 0
2011-11-12 Multi-Stage Fracture 2451.60 2452.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 0 0.0 0.0 0.0
2012 5976 0.0 0.0 0.0
2013 8565 0.0 0.0 0.0
2014 8688 0.0 0.0 0.0
2015 6427 0.0 0.0 0.0
2016 8419 0.0 0.0 0.0
2017 7305 0.0 0.0 0.0
2018 8729 0.0 0.0 0.0
2019 7418 0.0 0.0 0.0
2020 1924 0.0 0.0 0.0

For data sources see[6]

References