X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375030906000

Well Details

Well ID: 0375030906000
Loading map...
Location: 00/06-09-037-03W5/0
Location Alias: 00/06-09-37-03 W5M
Location Alias 2: 00/06-09-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 09
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 6-9-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0102337
License Date: 1983-07-22
License Status: RecCertified
Spud Date: 1983-07-30
Final Drill Date: 1983-08-16
Well Total Depth: 2290.00 m
Surface Hole Latitude: 52.165637
Surface Hole Longitude: -114.372686

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-07-22 Obtained License
1983-08-12 Drill Stem Test Performed
1983-08-16 Finished Drilling
1983-08-16 Well Mode changed to Drilled and Cased
1983-08-18 Drill Stem Test Performed
1983-08-19 Production Casing Operation Performed
1983-09-30 Perforation Treatment Performed - Jet Perforation
1983-10-06 Perforation Treatment Performed - Fractured
1983-10-29 Well Began Production
1983-10-29 Well Fluid changed to Crude Oil
1983-10-29 Well Mode changed to Pumping
1984-03-15 Well Log Performed
1984-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-03-17 Perforation Treatment Performed - Jet Perforation
1984-03-17 Well Fluid changed to Crude Oil
1984-03-17 Well Mode changed to Abandoned Zone
1985-07-22 Perforation Treatment Performed - Fractured
1997-04-23 Perforation Treatment Performed - Cement Squeeze
1997-04-23 Plug Back Performed
1997-04-24 Perforation Treatment Performed - Cement Squeeze
1997-04-24 Perforation Treatment Performed - Jet Perforation
1997-04-24 Plug Back Performed
1998-05-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-30 Perforation 2263.00 2265.50 7
1983-10-06 Fracture 2263.00 2265.50 0
1984-03-16 Packing Device Capped w/Cement 2257.50 2260.00 0
1984-03-17 Perforation 2018.50 2020.50 7
1985-07-22 Fracture 2018.50 2020.50 0
1997-04-23 Cement Squeeze 2018.50 2020.50 0
1997-04-24 Perforation 2263.00 2265.50 7
1997-04-24 Cement Squeeze 2263.00 2265.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1259 0.0 0.0 0.0
1984 546 0.0 0.0 0.0

For data sources see[5]

References