X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375010512002

Well Details

Well ID: 0375010512002
Loading map...
Location: 00/12-05-037-01W5/2
Location Alias: 00/12-05-37-01 W5M
Location Alias 2: 00/12-05-037-01 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 01
Section: 05
County/Municipality: Red Deer County
Well Name: HARVEST ET AL TINDA 12-5-37-1
Operator Name: Harvest Operations Corp.
License Number: 0352569
License Date: 2006-02-22
License Status: Issued
Spud Date: 2006-03-22
Final Drill Date: 2006-03-23
Well Total Depth: 885.00 m
Surface Hole Latitude: 52.155130
Surface Hole Longitude: -114.115924

For data sources see[1][2]

Well History

Date Event
2006-02-22 Obtained License
2006-03-14 Surface Casing Operation Performed
2006-03-23 Finished Drilling
2006-03-23 Production Casing Operation Performed
2006-03-23 Rig Released
2006-03-23 Well Log Performed
2006-03-23 Well Mode changed to Drilled and Cased
2006-06-05 Perforation Treatment Performed - Jet Perforation
2006-06-05 Well Log Performed
2006-06-06 Perforation Treatment Performed - Fractured
2006-08-21 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-06-05 Perforation 623.50 625.00 17
2006-06-05 Perforation 411.50 412.50 17
2006-06-05 Perforation 397.50 401.00 17
2006-06-05 Perforation 387.50 391.00 17
2006-06-05 Perforation 353.50 355.50 17
2006-06-06 Fracture 623.50 625.00 0
2006-06-06 Fracture 567.50 569.50 0
2006-06-06 Fracture 545.50 546.50 0
2006-06-06 Fracture 524.50 525.50 0
2006-06-06 Fracture 484.00 485.00 0
2006-06-06 Fracture 464.50 467.00 0
2006-06-05 Perforation 567.50 569.50 17
2006-06-06 Fracture 445.50 453.50 0
2006-06-06 Fracture 427.00 429.50 0
2006-06-06 Fracture 411.50 412.50 0
2006-06-06 Fracture 397.50 401.00 0
2006-06-06 Fracture 387.50 391.00 0
2006-06-06 Fracture 353.50 355.50 0
2006-06-05 Perforation 545.50 546.50 17
2006-06-05 Perforation 524.50 525.50 17
2006-06-05 Perforation 484.00 485.00 17
2006-06-05 Perforation 464.50 467.00 17
2006-06-05 Perforation 449.50 453.50 17
2006-06-05 Perforation 445.50 449.50 17
2006-06-05 Perforation 427.00 429.50 17

For data sources see[4]



References