X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374243212000

Well Details

Well ID: 0374243212000
Loading map...
Location: 00/12-32-037-24W4/0
Location Alias: 00/12-32-37-24 W4M
Location Alias 2: 00/12-32-037-24 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 24
Section: 32
County/Municipality: Red Deer County
Well Name: PENN WEST JOFFRE 12-32-37-24
Operator Name: Obsidian Energy Ltd.
License Number: 0021533
License Date: 1961-10-16
License Status: RecCertified
Spud Date: 1961-11-03
Final Drill Date: 1961-11-08
Well Total Depth: 1432.60 m
Surface Hole Latitude: 52.224876
Surface Hole Longitude: -113.406469

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-16 Obtained License
1961-11-08 Finished Drilling
1961-11-08 Well Mode changed to Drilled and Cased
1961-11-10 Drill Stem Test Performed
1961-11-10 Production Casing Operation Performed
1961-11-11 Perforation Treatment Performed - Open-Hole Completion
1962-03-14 Well Began Production
1962-03-14 Well Fluid changed to Crude Oil
1962-03-14 Well Mode changed to Pumping
1962-11-19 Well Began Injection
1962-11-19 Well Fluid changed to Water
1962-11-19 Well Type changed to Injection
1979-10-31 Well Fluid changed to Water
1979-10-31 Well Mode changed to Suspended
1979-10-31 Well Type changed to Injection
2007-07-15 Well Log Performed
2007-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-16 Perforation Treatment Performed - Jet Perforation
2007-07-16 Plug Back Performed
2007-07-16 Well Fluid changed to Water
2007-07-16 Well Log Performed
2007-07-16 Well Mode changed to Abandoned Zone
2007-07-16 Well Type changed to Injection
2007-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-17 Perforation Treatment Performed - Remedial Casing
2007-07-18 Perforation Treatment Performed - Jet Perforation
2007-07-18 Well Log Performed
2007-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-19 Perforation Treatment Performed - Remedial Casing
2007-08-02 Well Abandoned
2007-08-02 Well Fluid changed to Water
2007-08-02 Well Mode changed to Abandoned
2007-08-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-11-11 Open Hole/Barefoot Completion 1420.40 1432.60 0
2007-07-19 Packing Device Capped w/Cement 416.20 609.00 0
2007-07-16 Packing Device Capped w/Cement 1405.00 1413.00 0
2007-07-16 Perforation 880.00 881.00 17
2007-07-16 Perforation 794.00 795.00 17
2007-07-17 Remedial Casing Cementing 794.00 881.00 0
2007-07-17 Packing Device Capped w/Cement 686.50 870.00 0
2007-07-18 Perforation 620.00 621.00 17
2007-07-18 Perforation 475.00 476.00 17
2007-07-19 Remedial Casing Cementing 475.00 621.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0

For data sources see[5]

References