X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374200310002

Well Details

Well ID: 0374200310002
Loading map...
Location: 00/10-03-037-20W4/2
Location Alias: 00/10-03-37-20 W4M
Location Alias 2: 00/10-03-037-20 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 20
Section: 03
County/Municipality: County of Stettler No. 6
Well Name: CPR HANNA NO. 10
Operator Name: Gulf Canada Limited
License Number: 0007906
License Date: 1954-04-05
License Status: RecCertified
Spud Date: 1954-04-13
Final Drill Date: 1954-05-01
Well Total Depth: 1615.70 m
Surface Hole Latitude: 52.151902
Surface Hole Longitude: -112.775887

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-04-05 Obtained License
1954-05-01 Finished Drilling
1954-05-02 Liner Casing Operation Performed
1954-05-05 Perforation Treatment Performed - Open-Hole Completion
1973-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-04-11 Perforation Treatment Performed - Cement Plug
1973-04-11 Perforation Treatment Performed - Open-Hole Completion
1979-04-26 Perforation Treatment Performed - Open-Hole Completion
1979-04-27 Perforation Treatment Performed - Cement Plug
1979-04-27 Perforation Treatment Performed - Open-Hole Completion
1979-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-17 Perforation Treatment Performed - Open-Hole Completion
1981-06-24 Perforation Treatment Performed - Cement Squeeze
1981-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-27 Perforation Treatment Performed - Jet Perforation
1982-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-02 Perforation Treatment Performed - Jet Perforation
1989-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-15 Plug Back Performed
1989-03-15 Well Log Performed
1989-03-16 Well Log Performed
1989-03-17 Perforation Treatment Performed - Jet Perforation
1989-03-29 Perforation Treatment Performed - Cement Squeeze
1989-03-31 Perforation Treatment Performed - Jet Perforation
1989-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-22 Plug Back Performed
1989-09-26 Perforation Treatment Performed - Jet Perforation
1991-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-03 Perforation Treatment Performed - Cement Squeeze
1991-10-03 Perforation Treatment Performed - Jet Perforation
1991-10-03 Perforation Treatment Performed - Remedial Casing
1991-10-03 Plug Back Performed
1991-10-03 Well Mode changed to Abandoned
1991-10-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-05-05 Open Hole/Barefoot Completion 1595.60 1615.70 0
1981-06-24 Cement Squeeze 1595.60 1615.70 0
1981-06-27 Perforation 1600.00 1603.00 13
1981-06-27 Acid Treatment 1600.00 1603.00 0
1982-12-02 Perforation 1599.00 1601.00 13
1982-12-02 Acid Treatment 1599.00 1603.00 0
1989-03-15 Packing Device Capped w/Cement 1561.90 1590.00 0
1989-03-17 Perforation 1289.20 1291.20 13
1989-03-17 Perforation 1294.20 1296.20 13
1989-03-29 Cement Squeeze 1289.20 1296.20 0
1989-03-31 Perforation 1289.70 1290.70 13
1973-04-11 Cement Plug 1607.20 1615.70 0
1989-09-22 Packing Device Capped w/Cement 1274.50 1282.50 0
1989-09-26 Perforation 640.00 644.00 13
1991-10-03 Cement Squeeze 640.00 644.00 0
1991-10-03 Packing Device Capped w/Cement 610.40 635.00 0
1991-10-03 Perforation 222.60 223.10 13
1991-10-03 Remedial Casing Cementing 222.60 223.10 0
1991-10-03 Packing Device Capped w/Cement 192.40 217.00 0
1973-04-11 Open Hole/Barefoot Completion 1595.60 1607.20 0
1973-04-11 Acid Treatment 1595.60 1607.20 0
1979-04-26 Open Hole/Barefoot Completion 1595.60 1615.30 0
1979-04-27 Cement Plug 1602.40 1615.30 0
1979-04-27 Open Hole/Barefoot Completion 1595.60 1602.40 0
1979-04-28 Acid Treatment 1595.60 1602.40 0
1981-06-17 Open Hole/Barefoot Completion 1595.60 1615.70 0

For data sources see[4]



References