X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374190416003

Well Details

Well ID: 0374190416003
Loading map...
Location: 00/16-04-037-19W4/3
Location Alias: 00/16-04-37-19 W4M
Location Alias 2: 00/16-04-037-19 W4/03
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 19
Section: 04
County/Municipality: County of Stettler No. 6
Well Name: RICHARDS GADSBY 16-4-37-19
Operator Name: Pieridae Alberta Production Ltd.
License Number: 0355370
License Date: 2006-04-10
License Status: Issued
Spud Date: 2006-06-03
Final Drill Date: 2006-06-06
Well Total Depth: 1450.00 m
Surface Hole Latitude: 52.154565
Surface Hole Longitude: -112.653599

For data sources see[1][2]

Well History

Date Event
2006-04-10 Obtained License
2006-06-04 Surface Casing Operation Performed
2006-06-06 Finished Drilling
2006-06-06 Well Log Performed
2006-06-06 Well Mode changed to Drilled and Cased
2006-06-07 Production Casing Operation Performed
2006-06-07 Rig Released
2006-07-08 Perforation Treatment Performed - Jet Perforation
2006-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-12 Perforation Treatment Performed - Jet Perforation
2006-07-12 Plug Back Performed
2006-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-13 Perforation Treatment Performed - Jet Perforation
2006-07-13 Plug Back Performed
2006-08-02 Perforation Treatment Performed - Fractured
2006-12-29 Well Began Production
2006-12-29 Well Fluid changed to Gas
2006-12-29 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-07-08 Perforation 1402.00 1403.30 17
2006-07-10 Acid Treatment 1402.00 1403.30 0
2006-07-12 Packing Device Capped w/Cement 1382.00 1390.00 0
2006-07-12 Perforation 1232.00 1234.00 17
2006-07-13 Packing Device Capped w/Cement 1217.00 1225.00 0
2006-07-13 Perforation 1128.40 1129.70 17
2006-08-02 Fracture 1128.40 1129.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 76 0.0 0.0 0.0
2007 8538 0.0 0.0 0.0
2008 8751 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 8672 0.0 0.0 0.0
2011 8401 0.0 0.0 0.0
2012 8556 0.0 0.0 0.0
2013 8553 0.0 0.0 0.0
2014 8671 0.0 0.0 0.0
2015 8700 0.0 0.0 0.0
2016 2791 0.0 0.0 0.0
2017 8350 0.0 0.0 0.0
2018 2882 0.0 0.0 0.0
2019 456 0.0 0.0 0.0

For data sources see[5]

References