X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374140111000

Well Details

Well ID: 0374140111000
Loading map...
Location: 00/11-01-037-14W4/0
Location Alias: 00/11-01-37-14 W4M
Location Alias 2: 00/11-01-037-14 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 14
Section: 01
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 11-1-37-14
Operator Name: Paramount Resources Ltd.
License Number: 0069195
License Date: 1978-04-21
License Status: RecCertified
Spud Date: 1978-05-15
Final Drill Date: 1978-05-22
Well Total Depth: 1080.50 m
Surface Hole Latitude: 52.150649
Surface Hole Longitude: -111.879449

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-04-21 Obtained License
1978-05-20 Drill Stem Test Performed
1978-05-21 Drill Stem Test Performed
1978-05-22 Finished Drilling
1978-05-22 Production Casing Operation Performed
1978-06-07 Perforation Treatment Performed - Acid Wash - No Pressure
1978-06-07 Perforation Treatment Performed - Cement Squeeze
1978-06-07 Perforation Treatment Performed - Jet Perforation
1978-06-19 Perforation Treatment Performed - Fractured
1978-07-21 Well Mode changed to Drilled and Cased
1983-06-19 Well Began Production
1983-06-19 Well Fluid changed to Gas
1983-06-19 Well Mode changed to Flowing
1983-08-03 Well Fluid changed to Gas
1983-08-03 Well Mode changed to Suspended
1986-12-07 Perforation Treatment Performed - Cement Squeeze
1986-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-08 Well Fluid changed to Gas
1986-12-08 Well Mode changed to Abandoned Zone
1986-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-09 Perforation Treatment Performed - Jet Perforation
1986-12-09 Well Log Performed
1998-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-09 Plug Back Performed
1998-06-09 Well Log Performed
1998-06-10 Perforation Treatment Performed - Jet Perforation
1998-06-10 Well Log Performed
1998-06-11 Perforation Treatment Performed - Remedial Casing
1998-07-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-06-07 Perforation 1063.10 1065.00 7
1986-12-08 Packing Device Capped w/Cement 957.50 970.20 0
1986-12-09 Perforation 949.70 951.00 13
1986-12-09 Perforation 952.80 955.80 13
1986-12-09 Acid Treatment 949.70 955.80 0
1998-06-09 Packing Device Capped w/Cement 933.00 941.00 0
1998-06-10 Perforation 313.00 314.00 14
1998-06-11 Remedial Casing Cementing 313.00 314.00 0
1978-06-07 Perforation 1059.80 1061.30 7
1978-06-07 Acid Wash 1059.80 1065.00 0
1978-06-07 Cement Squeeze 1059.80 1065.00 0
1978-06-07 Perforation 1056.40 1058.30 7
1978-06-07 Perforation 949.80 951.00 7
1978-06-07 Perforation 954.60 957.10 7
1978-06-19 Fracture 949.80 957.10 0
1986-12-07 Cement Squeeze 949.80 957.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 273 0.0 0.0 0.0

For data sources see[5]

References