X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374081308002

Well Details

Well ID: 0374081308002
Loading map...
Location: 00/08-13-037-08W4/2
Location Alias: 00/08-13-37-08 W4M
Location Alias 2: 00/08-13-037-08 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 08
Section: 13
County/Municipality: Special Areas No. 4
Well Name: PENNWEST ET AL 8A3 PROVOST 8-13-37-8
Operator Name: Harvest Operations Corp.
License Number: 0128245
License Date: 1987-09-01
License Status: Suspension
Spud Date: 1987-09-05
Final Drill Date: 1995-08-18
Well Total Depth: 1055.00 m
Surface Hole Latitude: 52.177422
Surface Hole Longitude: -111.009832

For data sources see[1][2]

Well History

Date Event
1987-09-01 Obtained License
1995-08-12 Direction Drilling Operation Performed - Deviate
1995-08-18 Finished Drilling
1995-08-18 Well Mode changed to Drilled and Cased
1995-08-19 Well Log Performed
1995-08-20 Liner Casing Operation Performed
1995-08-20 Rig Released
1995-08-24 Well Log Performed
1995-09-26 Perforation Treatment Performed - Jet Perforation
1995-09-27 Perforation Treatment Performed - Remedial Casing
1995-10-04 Perforation Treatment Performed - Jet Perforation
1995-10-09 Well Began Production
1995-10-09 Well Fluid changed to Crude Oil
1995-10-09 Well Mode changed to Pumping
2007-08-01 Well Fluid changed to Crude Oil
2007-08-01 Well Mode changed to Suspended
2015-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-29 Plug Back Performed
2015-08-29 Well Fluid changed to Crude Oil
2015-08-29 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-08-12 411.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-26 Perforation 443.50 444.50 13
1995-09-27 Remedial Casing Cementing 443.50 444.50 0
1995-10-04 Perforation 1024.00 1026.50 13
2015-08-29 Packing Device Capped w/Cement 330.00 1016.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1738 0.0 0.0 0.0
1996 7586 0.0 0.0 0.0
1997 7998 0.0 0.0 0.0
1998 7538 0.0 0.0 0.0
1999 8193 0.0 0.0 0.0
2000 7867 0.0 0.0 0.0
2001 8452 0.0 0.0 0.0
2002 8457 0.0 0.0 0.0
2003 8509 0.0 0.0 0.0
2004 1888 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References