If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374050202020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.145237,"lon":-110.630731,"icon":""}]} |
Location: 02/02-02-037-05W4/0 | |
Location Alias: 02/02-02-37-05 W4M | |
Location Alias 2: 02/02-02-037-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 05 | |
Section: 02 | |
County/Municipality: Special Areas No. 4 | |
Well Name: SURGE ENERGY HZ PROVOST 2-2-37-5 | |
Operator Name: Surge Energy Inc. | |
License Number: 0442105 | |
License Date: 2011-12-29 | |
License Status: Issued | |
Spud Date: 2012-01-03 | |
Final Drill Date: 2012-01-11 | |
Well Total Depth: 2161.00 m | |
Surface Hole Latitude: 52.145237 | |
Surface Hole Longitude: -110.630731 |
Date | Event |
---|---|
2011-12-29 | Obtained License |
2012-01-04 | Direction Drilling Operation Performed - Horizontal |
2012-01-04 | Surface Casing Operation Performed |
2012-01-04 | Well Log Performed |
2012-01-07 | Intermediate Casing Operation Performed |
2012-01-08 | Well Log Performed |
2012-01-11 | Finished Drilling |
2012-01-11 | Well Log Performed |
2012-01-11 | Well Mode changed to Drilled and Cased |
2012-01-14 | Liner Casing Operation Performed |
2012-01-14 | Well Log Performed |
2012-01-15 | Perforation Treatment Performed - Open-Hole Completion |
2012-01-18 | Rig Released |
2012-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-11 | Well Began Production |
2012-02-11 | Well Fluid changed to Crude Oil |
2012-02-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-03 | Savanna Drilling Corp. | 436 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-04 | 461.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-15 | Open Hole/Barefoot Completion | 2154.60 | 2160.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 1587.60 | 1587.70 | 0 |
2012-01-26 | Multi-Stage Fracture | 1514.30 | 1514.40 | 0 |
2012-01-26 | Multi-Stage Fracture | 1442.40 | 1442.50 | 0 |
2012-01-26 | Multi-Stage Fracture | 1369.60 | 1369.70 | 0 |
2012-01-26 | Multi-Stage Fracture | 1295.80 | 1295.90 | 0 |
2012-01-26 | Multi-Stage Fracture | 1224.00 | 1224.10 | 0 |
2012-01-26 | Multi-Stage Fracture | 1151.00 | 1151.10 | 0 |
2012-01-26 | Multi-Stage Fracture | 1078.20 | 1078.30 | 0 |
2012-01-25 | Multi-Stage Fracture | 2150.20 | 2150.30 | 0 |
2012-01-25 | Multi-Stage Fracture | 2100.10 | 2100.20 | 0 |
2012-01-25 | Multi-Stage Fracture | 2026.60 | 2026.70 | 0 |
2012-01-25 | Multi-Stage Fracture | 1953.90 | 1954.00 | 0 |
2012-01-25 | Multi-Stage Fracture | 1880.40 | 1880.50 | 0 |
2012-01-25 | Multi-Stage Fracture | 1807.10 | 1807.20 | 0 |
2012-01-25 | Multi-Stage Fracture | 1733.60 | 1733.70 | 0 |
2012-01-25 | Multi-Stage Fracture | 1660.90 | 1661.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6681 | 0.0 | 0.0 | 0.0 |
2013 | 8512 | 0.0 | 0.0 | 0.0 |
2014 | 8621 | 0.0 | 0.0 | 0.0 |
2015 | 7519 | 0.0 | 0.0 | 0.0 |
2016 | 8480 | 0.0 | 0.0 | 0.0 |
2017 | 8613 | 0.0 | 0.0 | 0.0 |
2018 | 8592 | 0.0 | 0.0 | 0.0 |
2019 | 8534 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]