X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374042711A00

Well Details

Well ID: 0374042711A00
Loading map...
Location: A0/11-27-037-04W4/0
Location Alias: A0/11-27-37-04 W4M
Location Alias 2: A0/11-27-037-04 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 04
Section: 27
County/Municipality: Special Areas No. 4
Well Name: ARS 1A0 PROVOST 11-27-37-4
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0138779
License Date: 1989-02-14
License Status: Issued
Spud Date: 1989-02-26
Final Drill Date: 1989-02-28
Well Total Depth: 844.00 m
Surface Hole Latitude: 52.209828
Surface Hole Longitude: -110.495205

For data sources see[1][2]

Well History

Date Event
1989-02-14 Obtained License
1989-02-27 Surface Casing Operation Performed
1989-02-28 Finished Drilling
1989-02-28 Well Mode changed to Drilled and Cased
1989-03-01 Production Casing Operation Performed
1989-03-01 Rig Released
1989-03-01 Well Log Performed
1989-06-07 Perforation Treatment Performed - Jet Perforation
1989-06-07 Well Log Performed
1989-06-18 Well Began Production
1989-06-18 Well Fluid changed to Crude Oil
1989-06-18 Well Mode changed to Pumping
1989-08-08 Well Fluid changed to Crude Oil
1989-08-08 Well Mode changed to Suspended
1989-10-25 Well Began Injection
1989-10-25 Well Fluid changed to Water
1989-10-25 Well Type changed to Disposal
1989-10-26 Perforation Treatment Performed - Cement Squeeze
1989-10-27 Perforation Treatment Performed - Jet Perforation
1989-10-27 Well Log Performed
1989-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-28 Perforation Treatment Performed - Acid Wash - No Pressure
1991-01-13 Perforation Treatment Performed - Acid Wash - No Pressure
1993-04-29 Well Log Performed
1993-04-30 Perforation Treatment Performed - Jet Perforation
2008-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-06-07 Perforation 817.50 819.00 13
1989-10-26 Cement Squeeze 817.50 819.00 0
1989-10-27 Perforation 826.00 831.00 13
1989-11-10 Acid Treatment 826.00 831.00 0
1990-08-28 Acid Wash 826.00 831.00 0
1991-01-13 Acid Wash 826.00 831.00 0
1993-04-30 Perforation 822.00 826.00 14
2008-09-03 Acid Treatment 822.00 831.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1243 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References