X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374032415000

Well Details

Well ID: 0374032415000
Loading map...
Location: 00/15-24-037-03W4/0
Location Alias: 00/15-24-37-03 W4M
Location Alias 2: 00/15-24-037-03 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 03
Section: 24
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY HZ PROVOST 15-24-37-3
Operator Name: Surge Energy Inc.
License Number: 0492822
License Date: 2018-12-17
License Status: Issued
Spud Date: 2019-01-08
Final Drill Date: 2019-01-11
Well Total Depth: 2335.00 m
Surface Hole Latitude: 52.185808
Surface Hole Longitude: -110.303497

For data sources see[1][2]

Well History

Date Event
2018-12-17 Obtained License
2019-01-08 Surface Casing Operation Performed
2019-01-09 Direction Drilling Operation Performed - Deviate
2019-01-09 Direction Drilling Operation Performed - Horizontal
2019-01-11 Finished Drilling
2019-01-11 Well Log Performed
2019-01-11 Well Mode changed to Drilled and Cased
2019-01-12 Production Casing Operation Performed
2019-01-13 Rig Released
2019-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-03 Well Began Production
2019-02-03 Well Fluid changed to Crude Oil
2019-02-03 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-08 Precision Drilling Corporation 145 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-09 448.70 Deviate (5 - 79 degrees)
2019-01-09 953.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-20 Multi-Stage Fracture 2300.70 2301.00 0
2019-01-20 Multi-Stage Fracture 1904.40 1904.50 0
2019-01-20 Multi-Stage Fracture 1860.00 1860.10 0
2019-01-20 Multi-Stage Fracture 1815.60 1815.70 0
2019-01-20 Multi-Stage Fracture 1771.20 1771.30 0
2019-01-20 Multi-Stage Fracture 1726.60 1726.70 0
2019-01-20 Multi-Stage Fracture 1682.00 1682.10 0
2019-01-21 Multi-Stage Fracture 1637.70 1637.80 0
2019-01-21 Multi-Stage Fracture 1593.10 1593.20 0
2019-01-21 Multi-Stage Fracture 1548.50 1548.60 0
2019-01-21 Multi-Stage Fracture 1504.10 1504.20 0
2019-01-20 Multi-Stage Fracture 2259.20 2259.30 0
2019-01-21 Multi-Stage Fracture 1459.50 1459.60 0
2019-01-21 Multi-Stage Fracture 1414.90 1415.00 0
2019-01-21 Multi-Stage Fracture 1370.40 1370.50 0
2019-01-21 Multi-Stage Fracture 1325.80 1325.90 0
2019-01-21 Multi-Stage Fracture 1281.20 1281.30 0
2019-01-21 Multi-Stage Fracture 1236.20 1236.30 0
2019-01-21 Multi-Stage Fracture 1191.60 1191.70 0
2019-01-21 Multi-Stage Fracture 1147.40 1147.50 0
2019-01-21 Multi-Stage Fracture 1103.70 1103.80 0
2019-01-21 Multi-Stage Fracture 1059.10 1059.20 0
2019-01-20 Multi-Stage Fracture 2215.10 2215.20 0
2019-01-21 Multi-Stage Fracture 1014.40 1014.50 0
2019-01-20 Multi-Stage Fracture 2170.70 2170.80 0
2019-01-20 Multi-Stage Fracture 2127.00 2127.10 0
2019-01-20 Multi-Stage Fracture 2082.60 2082.70 0
2019-01-20 Multi-Stage Fracture 2038.00 2038.10 0
2019-01-20 Multi-Stage Fracture 1993.40 1993.50 0
2019-01-20 Multi-Stage Fracture 1948.90 1949.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-20 2019-01-21 830 1,035 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 potassium chloride 7447-40-7 100 77.0974 N/A
water Not Available 100 77.0974 N/A
Sand 16/30 Trican silica crystalline 14808-60-7 100 22.6094 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0094 N/A
dibromoacetonitrile 3252-43-5 100 0.0094 N/A
non-hazardous ingredients Not Available 100 0.0094 N/A
polyethylene glycol 25322-68-3 100 0.0094 N/A
sodium bromide 7647-15-6 100 0.0094 N/A
BXL-A Trican Breaker diethanolamine 111-42-2 100 0.0438 N/A
non-hazardous ingredients Not Available 100 0.0438 N/A
triethanolamine 102-71-6 100 0.0438 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0203 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0134 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.0869 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0869 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.002 N/A
propylene glycol 57-55-6 100 0.002 N/A
WG-111DA Trican Gelling Agent fumaric acid 110-17-8 100 0.0974 N/A
guar gum 9000-30-0 100 0.0974 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0194 N/A
non-hazardous ingredients Not Available 100 0.0194 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-17 2019-02-17 Municipal Water 1035

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7468 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-13 No Incident Encountered 0.00 0.00
2019-01-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References