If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374032204D20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.188837,"lon":-110.356957,"icon":""}]} |
Location: D2/04-22-037-03W4/0 | |
Location Alias: D2/04-22-37-03 W4M | |
Location Alias 2: D2/04-22-037-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 03 | |
Section: 22 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: GEAR PROVOST 4-22-37-3 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0146390 | |
License Date: 1990-11-20 | |
License Status: Suspension | |
Spud Date: 1990-12-07 | |
Final Drill Date: 1990-12-09 | |
Well Total Depth: 878.00 m | |
Surface Hole Latitude: 52.188837 | |
Surface Hole Longitude: -110.356957 |
Date | Event |
---|---|
1990-11-20 | Obtained License |
1990-12-07 | Surface Casing Operation Performed |
1990-12-09 | Finished Drilling |
1990-12-09 | Well Log Performed |
1990-12-09 | Well Mode changed to Drilled and Cased |
1990-12-10 | Production Casing Operation Performed |
1990-12-10 | Rig Released |
1990-12-14 | Perforation Treatment Performed - Jet Perforation |
1990-12-16 | Well Began Production |
1990-12-16 | Well Fluid changed to Crude Oil |
1990-12-16 | Well Mode changed to Pumping |
2005-05-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-05-24 | Plug Back Performed |
2005-05-24 | Well Fluid changed to Crude Oil |
2005-05-24 | Well Mode changed to Abandoned Zone |
2005-05-25 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-12-14 | Perforation | 843.00 | 845.00 | 13 |
2005-05-24 | Packing Device Capped w/Cement | 837.00 | 840.00 | 0 |
2005-05-25 | Perforation | 831.10 | 832.00 | 8 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 350 | 0.0 | 0.0 | 0.0 |
1991 | 8555 | 0.0 | 0.0 | 0.0 |
1992 | 8612 | 0.0 | 0.0 | 0.0 |
1993 | 8603 | 0.0 | 0.0 | 0.0 |
1994 | 8675 | 0.0 | 0.0 | 0.0 |
1995 | 8303 | 0.0 | 0.0 | 0.0 |
1996 | 8348 | 0.0 | 0.0 | 0.0 |
1997 | 8069 | 0.0 | 0.0 | 0.0 |
1998 | 8714 | 0.0 | 0.0 | 0.0 |
1999 | 8683 | 0.0 | 0.0 | 0.0 |
2000 | 8487 | 0.0 | 0.0 | 0.0 |
2001 | 7985 | 0.0 | 0.0 | 0.0 |
2002 | 7976 | 0.0 | 0.0 | 0.0 |
2003 | 8654 | 0.0 | 0.0 | 0.0 |
2004 | 8722 | 0.0 | 0.0 | 0.0 |
2005 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]