If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374031515C22 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.185519,"lon":-110.349025,"icon":""}]} |
Location: C2/15-15-037-03W4/2 | |
Location Alias: C2/15-15-37-03 W4M | |
Location Alias 2: C2/15-15-037-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 03 | |
Section: 15 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: DAYLIGHT 1C2 PROVOST 15-15-37-3 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0151079 | |
License Date: 1991-12-17 | |
License Status: Suspension | |
Spud Date: 1992-02-09 | |
Final Drill Date: 1992-02-11 | |
Well Total Depth: 869.00 m | |
Surface Hole Latitude: 52.185519 | |
Surface Hole Longitude: -110.349025 |
Date | Event |
---|---|
1991-12-17 | Obtained License |
1992-02-10 | Surface Casing Operation Performed |
1992-02-11 | Finished Drilling |
1992-02-11 | Production Casing Operation Performed |
1992-02-11 | Well Log Performed |
1992-02-11 | Well Mode changed to Drilled and Cased |
1992-02-12 | Rig Released |
1992-02-17 | Perforation Treatment Performed - Jet Perforation |
2005-01-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-01-27 | Plug Back Performed |
2005-01-28 | Perforation Treatment Performed - Jet Perforation |
2005-01-28 | Well Log Performed |
2005-02-03 | Perforation Treatment Performed - Fractured |
2005-02-11 | Well Began Production |
2005-02-11 | Well Fluid changed to Crude Oil |
2005-02-11 | Well Mode changed to Pumping |
2012-09-01 | Well Fluid changed to Crude Oil |
2012-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-02-17 | Perforation | 840.00 | 843.50 | 13 |
2005-01-27 | Packing Device Capped w/Cement | 827.00 | 835.00 | 0 |
2005-01-28 | Perforation | 780.50 | 781.50 | 17 |
2005-01-28 | Perforation | 782.50 | 786.50 | 17 |
2005-01-28 | Perforation | 788.50 | 791.00 | 17 |
2005-02-03 | Fracture | 780.50 | 791.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 2918 | 0.0 | 0.0 | 0.0 |
2007 | 7745 | 0.0 | 0.0 | 0.0 |
2008 | 7085 | 0.0 | 0.0 | 0.0 |
2009 | 8646 | 0.0 | 0.0 | 0.0 |
2010 | 8663 | 0.0 | 0.0 | 0.0 |
2011 | 8687 | 0.0 | 0.0 | 0.0 |
2012 | 3431 | 0.0 | 0.0 | 0.0 |
For data sources see[5]