If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374031513D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.186322,"lon":-110.358492,"icon":""}]} |
Location: D0/13-15-037-03W4/0 | |
Location Alias: D0/13-15-37-03 W4M | |
Location Alias 2: D0/13-15-037-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 03 | |
Section: 15 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: GEAR PROVOST 13-15-37-3 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0139529 | |
License Date: 1989-04-07 | |
License Status: Abandoned | |
Spud Date: 1989-04-10 | |
Final Drill Date: 1989-04-12 | |
Well Total Depth: 870.00 m | |
Surface Hole Latitude: 52.186322 | |
Surface Hole Longitude: -110.358492 |
Date | Event |
---|---|
1989-04-07 | Obtained License |
1989-04-11 | Surface Casing Operation Performed |
1989-04-12 | Finished Drilling |
1989-04-12 | Production Casing Operation Performed |
1989-04-12 | Rig Released |
1989-04-12 | Well Log Performed |
1989-04-12 | Well Mode changed to Drilled and Cased |
1989-04-15 | Perforation Treatment Performed - Jet Perforation |
1989-04-18 | Well Began Production |
1989-04-18 | Well Fluid changed to Crude Oil |
1989-04-18 | Well Mode changed to Pumping |
1995-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-09-15 | Plug Back Performed |
1995-09-15 | Well Abandoned |
1995-09-15 | Well Fluid changed to Crude Oil |
1995-09-15 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-04-15 | Perforation | 836.00 | 837.50 | 13 |
1995-09-15 | Packing Device Capped w/Cement | 820.00 | 828.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 6090 | 0.0 | 0.0 | 0.0 |
1990 | 8568 | 0.0 | 0.0 | 0.0 |
1991 | 8432 | 0.0 | 0.0 | 0.0 |
1992 | 8631 | 0.0 | 0.0 | 0.0 |
1993 | 8479 | 0.0 | 0.0 | 0.0 |
1994 | 8266 | 0.0 | 0.0 | 0.0 |
1995 | 3224 | 0.0 | 0.0 | 0.0 |
For data sources see[5]