If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374030901020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.161138,"lon":-110.388093,"icon":""}]} |
Location: 02/01-09-037-03W4/0 | |
Location Alias: 02/01-09-37-03 W4M | |
Location Alias 2: 02/01-09-037-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 03 | |
Section: 09 | |
County/Municipality: Special Areas No. 4 | |
Well Name: SURGE ENERGY HZ 102 PROVOST 1-9-37-3 | |
Operator Name: Surge Energy Inc. | |
License Number: 0488861 | |
License Date: 2018-04-19 | |
License Status: Issued | |
Spud Date: 2018-06-19 | |
Final Drill Date: 2018-06-22 | |
Well Total Depth: 2319.00 m | |
Surface Hole Latitude: 52.161138 | |
Surface Hole Longitude: -110.388093 |
Date | Event |
---|---|
2018-04-19 | Obtained License |
2018-06-19 | Surface Casing Operation Performed |
2018-06-20 | Direction Drilling Operation Performed - Deviate |
2018-06-21 | Direction Drilling Operation Performed - Horizontal |
2018-06-22 | Finished Drilling |
2018-06-22 | Well Log Performed |
2018-06-22 | Well Mode changed to Drilled and Cased |
2018-06-24 | Production Casing Operation Performed |
2018-06-24 | Rig Released |
2018-07-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-07-19 | Well Began Production |
2018-07-19 | Well Fluid changed to Crude Oil |
2018-07-19 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-06-19 | Precision Drilling Corporation | 145 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-06-20 | 508.80 | Deviate (5 - 79 degrees) |
2018-06-21 | 894.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-07-05 | Multi-Stage Fracture | 2286.30 | 2286.40 | 0 |
2018-07-05 | Multi-Stage Fracture | 1843.40 | 1843.50 | 0 |
2018-07-05 | Multi-Stage Fracture | 1798.80 | 1798.90 | 0 |
2018-07-05 | Multi-Stage Fracture | 1754.20 | 1754.30 | 0 |
2018-07-05 | Multi-Stage Fracture | 1710.30 | 1710.40 | 0 |
2018-07-05 | Multi-Stage Fracture | 1665.70 | 1665.80 | 0 |
2018-07-05 | Multi-Stage Fracture | 1621.10 | 1621.20 | 0 |
2018-07-05 | Multi-Stage Fracture | 1577.00 | 1577.10 | 0 |
2018-07-05 | Multi-Stage Fracture | 1533.70 | 1533.80 | 0 |
2018-07-05 | Multi-Stage Fracture | 1489.10 | 1489.20 | 0 |
2018-07-05 | Multi-Stage Fracture | 1444.40 | 1444.50 | 0 |
2018-07-05 | Multi-Stage Fracture | 2197.60 | 2197.70 | 0 |
2018-07-05 | Multi-Stage Fracture | 1399.80 | 1399.90 | 0 |
2018-07-05 | Multi-Stage Fracture | 1355.20 | 1355.30 | 0 |
2018-07-05 | Multi-Stage Fracture | 1311.80 | 1311.90 | 0 |
2018-07-05 | Multi-Stage Fracture | 1267.40 | 1267.50 | 0 |
2018-07-05 | Multi-Stage Fracture | 1222.80 | 1222.90 | 0 |
2018-07-05 | Multi-Stage Fracture | 1178.30 | 1178.40 | 0 |
2018-07-05 | Multi-Stage Fracture | 1133.60 | 1133.70 | 0 |
2018-07-05 | Multi-Stage Fracture | 1090.90 | 1091.00 | 0 |
2018-07-05 | Multi-Stage Fracture | 1046.30 | 1046.40 | 0 |
2018-07-05 | Multi-Stage Fracture | 1002.10 | 1002.20 | 0 |
2018-07-05 | Multi-Stage Fracture | 2153.00 | 2153.10 | 0 |
2018-07-05 | Multi-Stage Fracture | 957.50 | 957.60 | 0 |
2018-07-05 | Multi-Stage Fracture | 2108.40 | 2108.50 | 0 |
2018-07-05 | Multi-Stage Fracture | 2063.80 | 2063.90 | 0 |
2018-07-05 | Multi-Stage Fracture | 2019.20 | 2019.30 | 0 |
2018-07-05 | Multi-Stage Fracture | 1974.60 | 1974.70 | 0 |
2018-07-05 | Multi-Stage Fracture | 1930.00 | 1930.10 | 0 |
2018-07-05 | Multi-Stage Fracture | 1886.60 | 1886.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-07-05 | 2018-07-05 | 762 | 1,090 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 77.4504 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 21.9862 | N/A | ||
Tolcide PS75LT | Fusion Technologies Inc. | Bactericide/Biocide | Tetrakis(Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0661 | N/A | |
water | 7732-18-5 | 100 | 0.0661 | N/A | ||||
IH-BEZ-6D | Fusion Technologies Inc. | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0444 | N/A | |
IH-CS-4 | Fusion Technologies Inc. | Clay Control | Non-Whimis Regulated | Not Available | 100 | 0.0523 | N/A | |
IH-CBX-5 | Fusion Technologies Inc. | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1026 | N/A | |
Ethylene glycol | 107-21-1 | 100 | 0.1026 | N/A | ||||
Potassium Carbonate | 584-08-7 | 100 | 0.1026 | N/A | ||||
Potassium Hydroxide | 1310-58-3 | 100 | 0.1026 | N/A | ||||
IH-GA-1 | Fusion Technologies Inc. | Gelling Agent | Low toxicity mineral oil | 8042-47-5 | 100 | 0.2309 | N/A | |
IH-NS-2 | Fusion Technologies Inc. | Surfactant | Citrus Terpenes | 68647-72-3 | 100 | 0.0667 | N/A | |
Isopropyl Alcohol | 67-63-0 | 100 | 0.0667 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-07-03 | 2018-07-03 | Surface Water - River | 1090 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 4046 | 0.0 | 0.0 | 0.0 |
2019 | 8538 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-06-24 | No Incident Encountered | 0.00 | 0.00 |
2018-07-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]