X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374023202003

Well Details

Well ID: 0374023202003
Loading map...
Location: 00/02-32-037-02W4/3
Location Alias: 00/02-32-37-02 W4M
Location Alias 2: 00/02-32-037-02 W4/03
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 02
Section: 32
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC PROVOST 2-32-37-2
Operator Name: West Lake Energy Corp.
License Number: 0108903
License Date: 1984-08-24
License Status: Issued
Spud Date: 1984-08-27
Final Drill Date: 1984-08-30
Well Total Depth: 840.00 m
Surface Hole Latitude: 52.218481
Surface Hole Longitude: -110.254476

For data sources see[1][2]

Well History

Date Event
1984-08-24 Obtained License
1984-08-28 Surface Casing Operation Performed
1984-08-30 Finished Drilling
1984-08-30 Well Log Performed
1984-08-30 Well Mode changed to Drilled and Cased
1984-08-31 Well Log Performed
1984-09-01 Production Casing Operation Performed
1984-09-01 Rig Released
1984-09-05 Well Log Performed
1984-09-19 Perforation Treatment Performed - Jet Perforation
1988-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-02-25 Plug Back Performed
1988-02-25 Well Log Performed
1988-02-27 Perforation Treatment Performed - Jet Perforation
2014-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-02-03 Perforation Treatment Performed - Jet Perforation
2014-02-27 Perforation Treatment Performed - Jet Perforation
2014-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-04 Perforation Treatment Performed - Jet Perforation
2014-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-28 Perforation Treatment Performed - Casing Patch (Over Perfs)
2014-05-01 Well Began Injection
2014-05-01 Well Fluid changed to Water
2014-05-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-19 Perforation 795.00 798.00 13
2014-03-28 Casing Patch 720.90 721.90 0
2014-03-28 Casing Patch 795.00 798.00 0
1988-02-25 Packing Device Capped w/Cement 790.50 790.50 0
1988-02-27 Perforation 720.90 721.90 13
2014-02-03 Perforation 795.00 798.00 13
2014-02-03 Acid Treatment 720.90 721.90 0
2014-02-27 Perforation 823.00 830.00 20
2014-02-28 Acid Treatment 823.00 830.00 0
2014-03-04 Perforation 821.20 829.70 14
2014-03-05 Acid Treatment 821.20 829.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-06 No Incident Encountered 0.00 0.00
2014-03-31 No Incident Encountered 0.00 0.00

For data sources see[6]

References