X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374011809000

Well Details

Well ID: 0374011809000
Loading map...
Location: 00/09-18-037-01W4/0
Location Alias: 00/09-18-37-01 W4M
Location Alias 2: 00/09-18-037-01 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 01
Section: 18
County/Municipality: Municipal District of Provost No. 52
Well Name: Caltex_Res PROVOST 9-18-37-1
Operator Name: Caltex Resources Ltd.
License Number: 0054433
License Date: 1975-07-30
License Status: Issued
Spud Date: 1975-08-04
Final Drill Date: 1975-08-08
Well Total Depth: 833.00 m
Surface Hole Latitude: 52.181666
Surface Hole Longitude: -110.126063

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-07-30 Obtained License
1975-08-08 Finished Drilling
1975-08-08 Well Mode changed to Drilled and Cased
1975-08-11 Production Casing Operation Performed
1975-09-19 Perforation Treatment Performed - Cement Squeeze
1975-09-19 Perforation Treatment Performed - Jet Perforation
1975-09-19 Well Log Performed
1975-09-27 Perforation Treatment Performed - Jet Perforation
1975-10-20 Well Began Production
1975-10-20 Well Fluid changed to Crude Oil
1975-10-20 Well Mode changed to Pumping
1995-06-01 Well Fluid changed to Crude Oil
1995-06-01 Well Mode changed to Suspended
1995-07-06 Perforation Treatment Performed - Casing Patch (Over Perfs)
1995-07-07 Perforation Treatment Performed - Jet Perforation
1995-07-10 Well Fluid changed to Crude Oil
1995-07-10 Well Mode changed to Suspended
2001-07-04 Well Log Performed
2001-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-05 Perforation Treatment Performed - Jet Perforation
2001-07-05 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-19 Perforation 813.80 815.00 13
1975-09-19 Perforation 755.90 757.10 13
1975-09-19 Cement Squeeze 813.80 815.00 0
1975-09-19 Cement Squeeze 755.90 757.10 0
1975-09-27 Perforation 736.40 742.50 13
1995-07-06 Casing Patch 736.40 742.50 0
1995-07-07 Perforation 823.00 826.00 13
2001-07-05 Packing Device Capped w/Cement 805.00 813.10 0
2001-07-05 Perforation 780.30 782.70 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1593 0.0 0.0 0.0
1976 7152 0.0 0.0 0.0
1977 8391 0.0 0.0 0.0
1978 8529 0.0 0.0 0.0
1979 8669 0.0 0.0 0.0
1980 3404 0.0 0.0 0.0
1981 7085 0.0 0.0 0.0
1982 3566 0.0 0.0 0.0
1983 7663 0.0 0.0 0.0
1984 7591 0.0 0.0 0.0
1985 5628 0.0 0.0 0.0
1986 6378 0.0 0.0 0.0
1987 8636 0.0 0.0 0.0
1988 8058 0.0 0.0 0.0
1989 7286 0.0 0.0 0.0
1990 7516 0.0 0.0 0.0
1991 880 0.0 0.0 0.0
1992 1333 0.0 0.0 0.0
1994 96 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-07-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References