X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374011315000

Well Details

Well ID: 0374011315000
Loading map...
Location: 00/15-13-037-01W4/0
Location Alias: 00/15-13-37-01 W4M
Location Alias 2: 00/15-13-037-01 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 01
Section: 13
County/Municipality: Municipal District of Provost No. 52
Well Name: Caltex_Res PROVOST 15-13-37-1
Operator Name: Caltex Resources Ltd.
License Number: 0037711
License Date: 1970-01-30
License Status: Suspension
Spud Date: 1970-02-03
Final Drill Date: 1970-02-07
Well Total Depth: 808.30 m
Surface Hole Latitude: 52.184576
Surface Hole Longitude: -110.013389

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-01-30 Obtained License
1970-02-07 Finished Drilling
1970-02-08 Production Casing Operation Performed
1970-02-18 Perforation Treatment Performed - Jet Perforation
1971-07-20 Well Mode changed to Drilled and Cased
1975-11-07 Perforation Treatment Performed - Jet Perforation
1975-11-21 Well Began Production
1975-11-21 Well Fluid changed to Crude Oil
1975-11-21 Well Mode changed to Pumping
1977-11-01 Well Fluid changed to Crude Oil
1977-11-01 Well Mode changed to Suspended
1981-06-25 Perforation Treatment Performed - Cement Squeeze
1981-06-29 Perforation Treatment Performed - Jet Perforation
1981-06-30 Well Fluid changed to Crude Oil
1981-06-30 Well Mode changed to Pumping
1982-08-31 Well Fluid changed to Crude Oil
1982-08-31 Well Mode changed to Suspended
1995-07-01 Well Fluid changed to Crude Oil
1995-07-01 Well Mode changed to Flowing
1997-04-01 Well Fluid changed to Crude Oil
1997-04-01 Well Mode changed to Suspended
2002-04-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-04-14 Plug Back Performed
2002-04-14 Well Fluid changed to Crude Oil
2002-04-14 Well Mode changed to Abandoned Zone
2002-04-15 Perforation Treatment Performed - Jet Perforation
2019-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-05 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-02-18 Perforation 773.30 775.70 7
1975-11-07 Perforation 778.80 779.40 13
1981-06-25 Cement Squeeze 773.30 779.40 0
1981-06-29 Perforation 779.00 780.30 13
2002-04-14 Packing Device Capped w/Cement 760.00 768.00 0
2002-04-15 Perforation 743.70 746.70 34
2019-06-05 Packing Device Capped w/Cement 727.00 735.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 0 0.0 0.0 0.0
1975 744 0.0 0.0 0.0
1976 4560 0.0 0.0 0.0
1977 312 0.0 0.0 0.0
1981 3696 0.0 0.0 0.0
1982 3648 0.0 0.0 0.0
1995 3400 0.0 0.0 0.0
1996 6091 0.0 0.0 0.0
1997 890 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-06-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References