X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374010506002

Well Details

Well ID: 0374010506002
Loading map...
Location: 00/06-05-037-01W4/2
Location Alias: 00/06-05-37-01 W4M
Location Alias 2: 00/06-05-037-01 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 01
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: Caltex_Res PROVOST 6-5-37-1
Operator Name: Caltex Resources Ltd.
License Number: 0069539
License Date: 1978-05-15
License Status: Abandoned
Spud Date: 1978-06-24
Final Drill Date: 1978-06-26
Well Total Depth: 808.30 m
Surface Hole Latitude: 52.149247
Surface Hole Longitude: -110.113827

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-05-15 Obtained License
1978-06-26 Finished Drilling
1978-06-26 Well Mode changed to Drilled and Cased
1978-06-27 Well Log Performed
1978-06-28 Production Casing Operation Performed
1978-07-05 Perforation Treatment Performed - Jet Perforation
2006-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-14 Perforation Treatment Performed - Jet Perforation
2006-02-14 Plug Back Performed
2006-12-10 Well Began Production
2006-12-10 Well Fluid changed to Gas
2006-12-10 Well Mode changed to Flowing
2016-03-01 Well Fluid changed to Gas
2016-03-01 Well Mode changed to Suspended
2018-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-07-18 Plug Back Performed
2018-07-18 Well Fluid changed to Gas
2018-07-18 Well Mode changed to Abandoned Zone
2019-09-14 Well Abandoned
2019-09-14 Well Fluid changed to Gas
2019-09-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-05 Perforation 709.00 711.10 13
1978-07-05 Perforation 712.30 716.30 13
2006-02-14 Perforation 640.40 642.80 17
2006-02-14 Packing Device Capped w/Cement 696.00 704.00 0
2018-07-18 Packing Device Capped w/Cement 629.00 637.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 546 0.0 0.0 0.0
2007 8088 0.0 0.0 0.0
2008 8357 0.0 0.0 0.0
2009 8712 0.0 0.0 0.0
2010 8686 0.0 0.0 0.0
2011 8542 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8702 0.0 0.0 0.0
2015 8689 0.0 0.0 0.0
2016 960 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References